Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and renovation of a civil project in Friday Harbor, Washington. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Construction of several new improvements at the wastewater treatment plant (WWTP) within the existing active facility. New components include: _ New SBR Basin #3 and associated equipment _ Upgrade of existing SBR Basins #1 and #2 equipment; _ Improvements to the existing Blower Building; _ New Secondary Effluent Flow Control Structure just upstream of the Effluent Filter; _ Improvements to the UV Disinfection Area, including a new UV Area Shelter; _ 2W and 3W System improvements; _ Improvements to the existing Digester; _ Biosolids handling improvements; _ Miscellaneous system piping and vaults; _ Various site improvements. Bids are requested for the following Contract: Town of Friday Harbor WWTP Improvements. Owner anticipates that the Project's total bid price (including Base Bid, all Unit Quantity Items, and all Extra Work Items) will be approximately $16,000,000 to $18,000,000. Additive Bid Alternates will be added to the Project following the order of priority established in the Instructions to Bidders, Paragraph 18.05.C, until the project budget, which will be announced to all bidders after receiving all Bids but prior to opening them, is exceeded. The Project has an expected duration of 583 calendar days from the date when the Contract Times commence to run to the date the Work is completed and ready for final payment. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. It is anticipated that this project will be funded in part by the Washington State Department of Ecology and in part by USDA Rural Development CFDA Number - 10.760. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. American Iron and Steel: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The Town of Friday Harbor reserves the right to accept or reject any or all proposals and to waive informalities or irregularities. Adding the base bid, all unit quantity bid items, all extra work items, and all alternates). All bidders and subcontractors shall have a contractor's license to work in the State of Washington and a Town of Friday Harbor Business License *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 05/15/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Scott Wilson, PE, email: swilson@wilsonengineering.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bi

Bid Results

Water / Sewer

$6,426,400.00

Public - City

Renovation, Site Work

174

32

29

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 21, 2025

Project location map

375 Tucker Ave, Friday Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.