BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Friday Harbor, Washington. Completed plans call for the renovation of a transportation facility.

As of July 12, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Aircraft Fueling System Equipment. The Bidder must agree that the requirements and conditions of employment be observed and minimum wage rates, as established by the U.S. Secretary of Labor, or the Washington State Department of Labor and Industries, including any appropriate amendments. The contractor shall pay the state or federal prevailing wage rate, whichever is higher, and adhere to the most stringent requirements under this contract. No bid for a construction contract shall be received or considered by the PORT OF FRIDAY HARBOR unless the Bidder is registered with the Washington State Department of Licensing, as required by RCW 18.27. The requirements of 49 CFR part 26 apply to this contract. It is the policy of the PORT OF FRIDAY HARBOR to practice nondiscrimination based on race, color, sex or national origin in the award or performance of this contract. The PORT OF FRIDAY HARBOR encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The PORT OF FRIDAY HARBOR is an equal opportunity and affirmative action employer. Small, minority, veteran, and women-owned businesses are encouraged to submit bids. The PORT OF FRIDAY HARBOR has a DBE contract goal of 3.6% in compliance with their 49 CFR Part 26 program. The goal is a contractual obligation, and the CONTRACTOR is directed to refer to the PORT OF FRIDAY HARBOR for a copy of the Disadvantage Business Enterprise Program and goal methodology. The bidder shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to meet the contract goal for DBE participation in the performance of this contract. Description: Port of Friday Harbor is seeking a qualified contractor to fabricate, install, and commission Aircraft Fueling System Equipment at the Friday Harbor Airport. Elements of work for this project include, but are not limited to, furnishing, installing, and commissioning new above ground Jet-A and Avgas fuel tanks, associated fuel dispensing equipment, and other related appurtenances. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Value Notes: Between $500,000 and $750,000 40-01 Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner’s Engineer or RPR shall be and is hereby authorized to make, in writing, such inscope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent of the Contractor’s surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. Goals for minority participation for each trade: 6.1% Goals for female participation in each trade: 6.9%

Award

Transportation Terminals

$699,160.00

Public - Federal

Renovation

7

14

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
62
Bidding Soon
1,848
All Active Projects
717
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

img_map_placeholder

800 Franklin Rd, Friday Harbor, WA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.