BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2024 at 7:00 PM

Updated December 11, 2024

Demolition, site work, paving and new construction of a mixed-use development in Friday Harbor, Washington. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Hangar 80 Demolition and Replacement. Description of Proposal: Demolition of the existing hangar and existing pavement, as well as construction of a new two-unit box hangar for aircraft storage and pavement for aircraft access. The development includes storm drainage improvements, including construction of a new high flow media vault. The determination was made after reviewing a completed environmental checklist and other information on file with the lead agency. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This DNS is issued under WAC 197-11-340(2).

Award

Water / Sewer

$2,322,723.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
145
Bidding Soon
2,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

February 10, 2025

Project location map

800 Franklin Rd, Friday Harbor, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.