Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work and renovation of a civil project in Palm Bay, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Solicitation have been rejected South Regional Water Treatment Plant (SRWTP) Expansion Production Well SRO-5. The work shall be constructed in accordance with the plans and specifications. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following Construction of one 24-inch production well with a total casing length of approximately 320 feet and a total depth of 850 feet including surface casing, well casing, open hole, grout, development, water quality testing, plumbness and alignment testing, disinfection, well flange, and concrete pad. A series of geophysical logs and a video log will be performed on the water supply well after completion. A step-drawdown test shall be conducted on the water supply well in order to show proper development. An 8-hour constant rate discharge test shall be performed on well SRO-5 to determine the relative productivity of the Floridan aquifer in the area. Water quality testing shall also be performed during the construction and testing of the water supply well. Question Deadline 05/14/2025 at 5:00 PM ET Online Portal
Award
Water / Sewer
$1,040,450.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
To Be Determined, Palm Bay, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
