Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2025 at 8:00 PM
Updated May 20, 2025
Site work for a water / sewer project in Magna, Utah. Completed plans call for site work for a water / sewer project.
MWD Haynes Well 7 Rehabilitation The Work generally consists of mechanical and chemical cleaning of the District's Haynes Well 7 The Work included under this section includes furnishing all labor, materials, tools, equipment, transportation and other items required to remove existing pumping equipment, perform downhole video camera surveys, mechanically clean well using a brush and dual swab, chemically treat and remove scale and iron bacterial accumulations, chemically treat to remove residual drilling additives, swab and bail to remove formation clay, silt, fine sand and other debris, development pumping to remove chemicals, pH control and chemical neutralization, disposal of pumped water, pump test, reinstall pumping equipment and disinfect well and equipment. All interior surfaces must consist of products complying with ANSI/NSF Standard 61. This requirement applies to the pump, pump column, tremie pipe, electrical wire, sensors, and all other equipment or surfaces which may make contact with drinking water. B. All substances introduced into the well during construction or development shall be certified to comply with ANSI/NSF Standard 60 or as specifically approved in writing by the Division of Drinking Water. This requirement applies to treatment additives including biocide dispersants, wetting agents, surfactants, and acid for removing mineral deposits. Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents. 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submit questions via the Bidding Documents Website. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$188,363.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
8885 W 3500 S, Magna, UT
Related To This Project
Magna, UT
Bid Date: Jun 10 2025
Magna, UT
Bid Date: May 28 2025
Magna, UT
Bid Date: Aug 27 2025
Magna, UT
Bid Date: Nov 07 2025
Magna, UT
Bid Date: Apr 23 2025
Magna, UT
Bid Date: Apr 22 2025
Magna, UT
Bid Date: Apr 24 2025
Magna, UT
Bid Date: Mar 29 2025
Magna, UT
Bid Date: Feb 25 2025
Magna, UT
Bid Date: Feb 21 2025
Magna, UT
Bid Date: Feb 11 2025
Magna, UT
Bid Date: Jan 31 2025
Magna, UT
Bid Date: Apr 24 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
