Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 25, 2025 at 8:00 PM
Updated June 26, 2025
Site work and new construction of a pre-engineered storage facility in Fontana, Wisconsin. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
**As of June 25,2025, this project is awarded to Scherrer Construction Co., Inc in the amount of $461,970 base bid and $66,970 alternate bid.** DPW Pole Barn Est. Completion Date: Oct. 15, 2025 Pre-Qualification: Yes Est. Value: $ 250,000.00 Project involves construction of an unheated storage building of approximate dimensions 80 feet by 60 feet with a 16-foot ceiling height on a concrete slab. Building shall be insulated and include (4) 14-foot by 14-foot overhead doors, and (2) walk doors. All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Fontana-on-Geneva Lake and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Fontana-on-Geneva Lake reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. . A Bidder's qualification statement must be delivered to Village of Fontana-on-Geneva Lake at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Fontana-on-Geneva Lake equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Fontana-on-Geneva Lake as liquidated damages.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$528,940.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 9, 2025
To Be Determined, Fontana, WI
Related To This Project
Fontana, WI
Bid Date: Jan 07 2025
Fontana, WI
Bid Date: Feb 08 2024
Fontana, WI
--
Fontana, WI
Bid Date: Jan 04 2024
Fontana, WI
Bid Date: Sep 13 2022
Fontana, WI
--
Fontana, WI
Bid Date: Aug 31 2023
Fontana, WI
Bid Date: Aug 31 2023
Fontana, WI
Bid Date: Jun 06 2023
Fontana, WI
Bid Date: Jun 30 2022
Fontana, WI
Bid Date: Jan 29 2019
Fontana, WI
Bid Date: Aug 15 2019
Fontana, WI
Bid Date: Feb 14 2020
Madison, WI
--
Milwaukee, WI
Bid Date: Apr 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
