BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 13, 2025

Site work for a water / sewer project in Hillsboro, Missouri. Completed plans call for site work for a water / sewer project.

Grandview R-2 School District Hillsboro, Missouri Wastewater Treatment Plant General Notice Grandview R-2 School District (Owner) is requesting Bids for the construction of the following Project:19,000 gallons per day Wastewater Treatment Plant. The Project includes the following Work. 1.Excavation and placement and backfill for the sewage treatment plant (plant is being manufactured by DPI Water Solutions in Tifton, GA) and will be delivered to the site bythe manufacturer. 2. This contractor will be responsible for providing a crane to offload the treatment plant delivered by the Manufacturer. 3. Contractor shall provide concrete foundation in accordance with the project plans 4. Provide a crane to set the plant in place5.Construct the influent and effluent sanitary sewers. 6. Provide fencing, gates, and warning signs around treatment plant as shown on plans. 7. Provide piping and electrical connections to the treatment plant as indicated on theproject plans. 8. Pumps and related equipment for the Tertiary Filter will be provided by the Manufacturer but will require installation and connection by the Contractor as shown onthe project plans. 9. Provide and Install Yard Hydrant and Hot Box as shown on the project plans.10. Set various treatment components in place, including blowers*, miscellaneous plantpiping, fittings, valves, handrails, disinfection equipment*, flowmeter* as indicatedon the project plans. (* equipment will be provided by the plant manufacturer).Owner anticipates that the Project's total bid price will be approximately $400,000. The Projecthas an expected duration of 60-90 days. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Non-Bidders, and Bidders who obtain more than one set of the Bidding Documents, will receive a refund of $50 for documents returned in good condition within the time limit indicated above. Make deposit checks for Bidding Documents payable to Fribis Engineering, Inc.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
87
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

June 4, 2025

Project location map

To Be Determined, Hillsboro, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.