Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Site work for a playground / park / athletic field in Marathon, Florida. Conceptual plans call for site work for a playground / park / athletic field.
Community Park Soccer Field Refurbishment All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Marathon Staff or Officials Other Than the Specified Contact Person. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. The project shall be completed no later than July 31st, 2025. Scope of Work The Scope of Work shall include, but not limited to, all work shown, listed and specified. The contractor is required to provide a complete job. The Scope of Work consists of Soccer Fields Refurbishment as listed below in the City of Marathon. This includes all necessary work for complete refurbishment on large and small soccer fields at Marathon Community Park as delineated below. 1. All work to be completed on two soccer fields at Marathon Community Park. Large field 120 yards X 70 yards. Small field 90 yards X 45 yards, and adjacent sodded areas, excluding baseball fields, for a total of xxxx SF. 2. The City will complete two rounds of killing existing turf. Final application shall be sprayed on June 12, for a beginning date of existing turf removal by contractor on June 23, 2025. Contractor shall remove all existing turf, grass, weed and all vegetation in the designated area. 3. Rototill existing sub grades. 4. Add 2” minimum of new top soil. 5. Roll and apply one application of fertilizer with pre-emergent. 6. Finish grade sub base with laser 7. Furnish, deliver and install Tifway 419 Bermuda Grass Rolls to Community Park. Sod must be 100% weed free. Sod installation shall maintain a minimum of 12” from all adjacent fences and structures. 8. Provide maintenance and fertilizer schedule for proper maintenance of turf. 9. All work to be completed between June 23, 2025 and July 31, 2025. Note: There is an existing sprinkler field which will have to be accommodated for the refurbishment. Soccer fields will be closed during refurbishment.
Project Abandoned
Playgrounds / Parks / Athletic Fields
$323,237.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
July 25, 2025
200 36th St, Marathon, FL
Related To This Project
Marathon, FL
Bid Date: Jun 23 2025
Marathon, FL
Bid Date: Aug 08 2025
Marathon, FL
Bid Date: Feb 20 2019
Marathon, FL
Bid Date: Nov 30 2020
Marathon, FL
Bid Date: Sep 04 2025
Marathon, FL
Bid Date: Sep 05 2025
Marathon, FL
--
Marathon, FL
Bid Date: Mar 12 2019
Marathon, FL
Bid Date: May 29 2020
Marathon, FL
Bid Date: Apr 17 2025
Marathon, FL
Bid Date: Mar 25 2025
Marathon, FL
Bid Date: Mar 12 2025
Marathon, FL
Bid Date: Apr 10 2025
Marathon, FL
Bid Date: Feb 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
