BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a playground / park / athletic field in Marathon, Florida. Conceptual plans call for site work for a playground / park / athletic field.

Community Park Soccer Field Refurbishment All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the City of Marathon Staff or Officials Other Than the Specified Contact Person. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. The project shall be completed no later than July 31st, 2025. Scope of Work The Scope of Work shall include, but not limited to, all work shown, listed and specified. The contractor is required to provide a complete job. The Scope of Work consists of Soccer Fields Refurbishment as listed below in the City of Marathon. This includes all necessary work for complete refurbishment on large and small soccer fields at Marathon Community Park as delineated below. 1. All work to be completed on two soccer fields at Marathon Community Park. Large field 120 yards X 70 yards. Small field 90 yards X 45 yards, and adjacent sodded areas, excluding baseball fields, for a total of xxxx SF. 2. The City will complete two rounds of killing existing turf. Final application shall be sprayed on June 12, for a beginning date of existing turf removal by contractor on June 23, 2025. Contractor shall remove all existing turf, grass, weed and all vegetation in the designated area. 3. Rototill existing sub grades. 4. Add 2” minimum of new top soil. 5. Roll and apply one application of fertilizer with pre-emergent. 6. Finish grade sub base with laser 7. Furnish, deliver and install Tifway 419 Bermuda Grass Rolls to Community Park. Sod must be 100% weed free. Sod installation shall maintain a minimum of 12” from all adjacent fences and structures. 8. Provide maintenance and fertilizer schedule for proper maintenance of turf. 9. All work to be completed between June 23, 2025 and July 31, 2025. Note: There is an existing sprinkler field which will have to be accommodated for the refurbishment. Soccer fields will be closed during refurbishment.

Project Abandoned

Playgrounds / Parks / Athletic Fields

$323,237.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
12
Bidding Soon
455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2025

July 25, 2025

Project location map

200 36th St, Marathon, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.