BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work and outdoor lighting for a transportation facility in Anchorage, Alaska. Working plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

As per the Owner the project has been rejected. This federally funded contract includes all necessary design and construction services as required to construct the installation of a flywheel energy uninterruptible power supply (UPS) system for the airfield lighting vault at Ted Stevens Anchorage International Airport. Also included in the scope are updates to the lighting regulators. Anticipated NTP Date: July 25, 2025 Substantial Completion Date: October 30, 2026 Engineers Estimate Range:Between $2,500,000 and $5,000,000 An Offeror may direct questions concerning proposal procedures and requirements to Sharon Smith, Central Region Chief of Contracts, P.O. Box 196900 Anchorage, AK 99519-6900 or at email: Sharon.smith@alaska.gov or at Phone: (907) 269-0414. All Proposals shall be accompanied by a Bid Security in the amount of 5% of the Proposed Price. The Bid Security shall be in the form of an acceptable Bid Bond (Section 00410), or a certified check, cashier's check or money order made payable to the State of Alaska. Bid Bonds must be accompanied by a legible Power of Attorney. The surety of a Bid Bond may be any corporation or partnership authorized to do business in Alaska as an insurer under AS 21.09. Telegraphic or telefacsimile notification of execution of a Bid Bond does not meet the requirements of Bid Security accompanying the Proposal All questions about this notice may be directed to the Manager of the Civil Rights Office, (907) 269-0848. AK DOT - RFP D/B - ANC Airport Lighting Control System Resiliency Design- Build *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Transportation Terminals

$5,000,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2025

December 26, 2025

Project location map

5000 W International Airport Rd, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.