Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
Site work and paving for a mixed-use development in Maple Lake, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of July 03, 2025, this project has not yet been awarded. The project is expected to be awarded on July 15th. Work Consists of the Construction of a New Street and Utilities With Approximately the Following Quantities: 1,500 Lf of 12"-36" Rcp Storm Sewer Pipe 2,170 Lf of 8" & 21" Pvc Sanitary Sewer Pipe 2,140 Lf of 6"-12" Pvc Watermain Pipe 5,000 Lf of 4" Drain Tile 1,100 Sy of Bituminous Reclamation 3,300 Cy of Aggregate Base 5,000 Cy of Select Granular Borrow 10,000 Sy of Geotextile Road Fabric 2,500 Tn of Bituminous Course Mixtures 4,600 Lf of Concrete Curb and Gutter 14,000 Sf of Concrete Walk & Other Miscellaneous Restoration Items. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. Question Deadline May 15, 2025 Direct inquiries to Engineer's Project Manager, Chuck Boser, at (320) 229-5537 and Chuck.Boser@Stantec.com. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and Further Reserves the Right to Award the Contract to the Best Interests of the Owner. The Successful Bidder Must Be a "Responsible Contractor." the Term "Responsible Contractor" Means a Contractor as Defined in Minnesota Statutes, Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project, and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor.
Bid Results
Roads / Highways
$2,094,950.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
July 21, 2025
5th St NW, Maple Lake, MN
Related To This Project
Maple Lake, MN
Bid Date: Aug 19 2025
Maple Lake, MN
Bid Date: May 21 2025
Maple Lake, MN
--
Maple Lake, MN
Bid Date: May 15 2019
Maple Lake, MN
Bid Date: Apr 08 2021
Maple Lake, MN
--
Maple Lake, MN
--
Maple Lake, MN
--
Maple Lake, MN
Bid Date: Nov 05 2024
Maple Lake, MN
Bid Date: Jan 29 2025
Maple Lake, MN
Bid Date: Aug 22 2024
Maple Lake, MN
Bid Date: Jun 05 2024
Maple Lake, MN
Bid Date: May 21 2024
Maple Lake, MN
Bid Date: May 08 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
