BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work and paving for a mixed-use development in Maple Lake, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Question Deadline 08/12/2025- Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. 2025 Structure Rehabilitation Project In General, the Work Consists of the Construction of Storm Sewer Improvements With Approximately the Following Quantities: 75 Lf of Storm Sewer Pipe Replacement 11 Ea Storm Structure Replacements 4 Ea Spectra Shield Structure Lining 300 Sy of Bituminous Replacement 30 Sy of Concrete Dwy Replacement 555 Lf of Concrete Curb and Gutter Replacement 50 Sy of 4" & 6" Concrete Walk Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Successful Bidder Must Be a "Responsible Contractor." the Term "Responsible Contractor" Means a Con Tractor as Defined in Minnesota Statutes, Section 160.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Con-tractor and is Not Eligible to Be Awarded. A Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and Further Reserves the Right to Award the Contract to the Best Interests of the Owner. The Owner Reserves the Right to Retain. The Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids.

Award

Roads / Highways

$267,558.00

Public - City

Paving, Site Work

22

15

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
118
Bidding Soon
1,513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

Multiple Locations, Maple Lake, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.