BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a mixed-use development in Tualatin, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

2025 Pavement Maintenance Program - Overlay Identification of Project: Major Items of Work Consist of 3,175 Tons of Asphalt With Fiber Reinforcement, 2,060 Square Yards of Full Depth Patch, 9,720 Square Yards of Cold Plane Removal, 23 Ada Ramp Improvements, Signing and Striping, and Landscape Restoration Contract Time: the Contractor Shall Begin Construction Work Within 30 Calendar Days Following the Notice to Proceed. Contractor Shall Reach Substantial Completion of All Work by August 22, 2025. The Contractor Shall Reach Final Completion of the Project No Later Than August 31, 2025. . Proposals Must Be Made Upon the Proposal Form Bound in the Contract Documents and Must Be Accompanied by a Certified Check or Proposal Bond Payable to the City of Tualatin (County of Washington, State of Oregon) in an Amount Not Less Than Ten Percent (10%) of the Total Amount of the Bid. This is a Contract for a Public Work, Subject to Ors 279c.800 to 279c.870 and Prevailing Wage is Required. The Bid Must Indicate Whether the Contractor is a Resident Contractor, as Defined in Ors 279a.120. The Bidder Shall Deliver as Part of the Bid a Written Certification That the Bidder Has Not Discriminated and Will Not Discriminate Against Minority, Women or Emerging Small Business Enterprises in Obtaining Any Required Subcontracts. Failure to Do So Shall Be Grounds for Disqualification. Right of Rejection: the City of Tualatin Will Investigate and Determine the Qualifications of the Apparent Low Bidder Prior to Awarding the Contract. The City of Tualatin Reserves the Right to Reject Any Bid Not in Compliance With All Prescribed Public Procedures and Requirements, and May Reject for Good Cause Any or All Bids Upon a Finding That It is in the Public Interest to Do So. Bids Cannot Be Withdrawn Within Forty-five Days (45) After the Bid Closing. Written Addenda: the City Reserves the Right to Make Changes to the Invitation to Bid and the Contract Documents by Written Addenda Prior to the Bid Closing. Addenda Shall Be Made Available to All Contractors Who Have Joined the Plan Holders List on the City of Tualatin Bid Website, as Provided in the Contract Documents. The Engineers' Estimates are approximately $1,500,000 for Schedule A and $90,000 for Schedule B. Total - $ 1,590,000

Award

Roads / Highways

$1,590,000.00

Public - City

Paving, Site Work

88

7

4

5

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
47
Bidding Soon
1,056
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

July 21, 2025

Project location map

10699 SW Herman Rd, Tualatin, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.