Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work and paving for a mixed-use development in South Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 04, 2025, the project was awarded to Wandel Contractors, Inc., with an awarded amount of $1,521,285.75.** Site Directions: Michigan Avenue (5th Avenue to 10th Avenue) - Base Bid and Marquette Avenue (5th Avenue to 8th Avenue) - Alternate - A and 6th Avenue (Montana Avenue to Michigan Avenue - Alternate - B and Streets Department Parking Lot - Alternate - C City of South Milwaukee, Milwaukee County, Wisconsin. Bid submission info : with the notation "Sealed Bid Enclosed" on the face thereof. The City of South Milwaukee reserves the right to reject any or all bids and waive any informalities in the bidding. No bids shall be withdrawn after the opening of the bids without the consent of the City of South Milwaukee, Wisconsin, for a period of thirty (30) days after the scheduled time for closing bids. All proposals must be submitted on a form provided for that purpose as issued within the Document Set, together with a certified check or a bid bond not less than five (5%) percent of the bid, payable to the City of South Milwaukee as a guarantee that, if the bid accepted, the bidder will execute and file the contract and a performance bond in the amount of one hundred (100%) percent of the total proposal price within ten (10) working days after the award of the contract. Failure to execute such contract and performance bond shall be cause for forfeiture of the check or bid bond as liquidated damages. Est. Completion Date: Oct. 31, 2025 Pre-Qualification: Yes Asphalt Pavement Removal 22,300 S.Y. HMA Pavement 6,200 TONS Concrete Pavement 7 1/2" 720 S.Y. Concrete Curb & Gutter 24" 4,450 L.F. Concrete Sidewalk 5" 9,310 S.F. Storm Sewer Pipe Reinforced Concrete 1,140 L.F. Manhole 7 EA. Curb Inlet 27 EA. Miscellaneous quantities of unclassified excavation, base aggregate, and saw cutting. The document set describes items and quantities for bid proposal. Utility work under a different contract shall be completed by July 14, 2025, unless otherwise allowed by the City Engineer.

Award

Roads / Highways

$1,521,286.00

Public - City

Paving, Site Work

67

7

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
189
Bidding Soon
2,722
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Multiple Locations, South Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.