BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work and paving for a civil project in Saratoga, California. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

As of July 18, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Reference Number 0000385281 Bid Intent Not Available Job Location: Fremont Older Open Space Preserve The winter storms of 2022/2023 damaged an existing perched culvert running underneath Prospect Road, which is an approximately 10-foot-wide traffic-rated, multi-use asphalt road. The erosion around the 55-foot long, 4-foot-wide corrugated metal pipe (CMP) triggered a slope failure washing out a 10-foot section of the culvert, culvert headwall, and portions of the creek bank. The scope of work includes replacement of those elements and added defensible measures, such as extending the culvert pipe to its original length, constructing a new headwall/footing, AC road repair above the culvert, and embankment stabilization. The Prospect Road Culvert Replacement Project consists of removing and replacing a 10-foot section of the impacted corrugated metal pipe (CMP), construct a reinforced concrete culvert headwall and constituent footing, remove and repair AC roadway uphill of the damaged culvert, and to stabilize the embankment with approved rock rip rap, erosion control BMPS, and District provided seed. August 11, 2025 On-site activities are anticipated to commence October 31, 2025 Work on site complete November 2025 Project Close Out Award of Contract is anticipated to occur on July 9, 2025. On site activities cannot commence prior to contractor submitting all pre-construction submittal requirements. On-site construction activities are anticipated to take approximately 8 weeks. Hard Copy: The Bid Proposal must be delivered (with all forms in Section C. Bid Forms) to the following address, in a sealed envelope marked "Prospect Road Culvert Replacement Project": Midpeninsula Regional Open Space District Attention: Alex Harker Capital Project Manager III 5050 El Camino Real Los Altos, CA 94022-1404 Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required - Prevailing Wage Required Question Deadline 05/15/2025 at 12:00 PM PT Questions are submitted online Yes, For additional information, contact Alex Harker, Capital Project Manager III, Midpeninsula Regional Open Space District, 5050 El Camino Real, Los Altos, CA 94022-1404; (650) 772- 3640 or aharker@openspace.org

Bid Results

Bridges / Tunnels

$222,222.00

Public - State/Provincial

Paving, Site Work

55

9

84

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
174
Bidding Soon
2,540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

August 11, 2025

Project location map

Prospect Rd, Saratoga, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.