EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2025 at 8:00 PM

Updated July 10, 2025

Site work and paving for a civil project in Mount Vernon, Washington. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of July 8,2025, the project is on hold. No definite date for the rebid.** Pipeline Relocation at Alger Interchange Project Installation of approximately 215 linear feet of water pipeline, including 177 LF of 14-inch HDPE DR11 and 38 LF of diameter CL50 ductile iron pipe, with 40 LF of 24-inch C-900 PVC casing at the deepest portion of the installation (will be below a future culvert to be constructed by Others). The project also includes the installation of approximately 177 linear feet of 2-inch HDPE fiber optic conduit. All installation is to be done by traditional trenching methods along Lake Samish Road, west of Interstate 5 Interchange southbound off-ramp, in unincorporated Skagit County, State of Washington. Work includes asphalt removal and replacement, rock excavation, shoring, traffic control, and pressure and purity testing of the pipe, and site restoration, along with incidentals and appurtenances, such as valves, fittings, dewatering, in estimated quantities identified in the Bid Proposal. The location for the project is: Lake Samish Road, west of the Interstate 5 Interchange (Exit 240) southbound off-ramp, in unincorporated Skagit County, State of Washington, as shown on the Contract Drawings. Question Deadline 05/29/2025 Any requests for information or interpretation of the Bid Documents shall be made by email to Catherine Price, Contract Coordinator, Price@SkagitPUD.org. All such requests shall be received no later than three (3) days prior to bid opening

Final Planning

Water / Sewer

$1,893,372.00

Public - County

Paving, Site Work

19

12

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Slings

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
57
Bidding Soon
1,657
All Active Projects
689
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

January 9, 2026

img_map_placeholder

Multiple Locations, Mount Vernon, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.