BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Site work for a road / highway in Farmington, Michigan. Completed plans call for site work for a road / highway.

Traffic Signal Modernization at 2 Locations on M-5sb Off Ramp/halsted Road at Grand River Avenue and Old Bl-96 (Grand River Avenue) at Halsted/freedom Roads in the Cities of Farmington and Farmington Hills, Oakland County. 0% DBE Participation Required Net Classification Required for This Project is 817 L Completion Date: 10/15/2026 Control Sec Job No Federal No CPMG 63022 210758A 25A0635 MIDOT: 250606 002 - Traffic Signal Modernization at 2 Locations on M-5sb

Bid Results

Roads / Highways

$792,130.00

Public - State/Provincial

Site Work

76

6

3

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
223
Bidding Soon
2,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

July 7, 2025

Project location map

Multiple Locations, Farmington, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.