Site work for a civil project in Reno, Nevada. Working plans call for site work for a water / sewer project.

As of August 25, 2025, a construction manager and an engineer has been selected and this project is in the pre-construction/negotiated status. Design is expected to be completed in October 2025. It is anticipated sub-bidding will commence in October 2025 with construction starting in December 2025. *The closed solicitation has been included below for reference: The Washoe County Community Services Department (CSD) is requesting qualified firms to respond to a Request for Qualifications (RFQ) for a construction manager at risk (CMAR), for the development and construction of the Pleasant Valley Interceptor - Phase 3 Project. The process is intended to evaluate the submissions and score per instructions in RFQ package. Work includes, but is not limited to, construction of sewage collection system infrastructure including of 18-inch, 15-inch, 12-inch, and 8-inch diameter gravity sewer pipeline and manholes, 8-inch and 12-inch diameter recycled water pipeline, a 2.2 million gallon per day sewer lift station and associated 10-inch diameter force main sewer pipeline with parallel 12-inch diameter recycled water pipeline; and includes two crossings of Steamboat Creek requiring microtunneling construction and three crossing of the Nevada Department of Transportation highways using a jack and bore construction method. Selected Firm Interviews: June 03, 2025 Approximate Award Date: July 15, 2025 SELECTION PROCESS Review Committee will make selection based on the Evaluation Factors identified in RFQ package. The Review Committee will be comprised of County staff and may include other members representing local entities. Based upon evaluation of the RFQ's, a Firm may be selected, otherwise the 2 top ranked Firms may be invited to interview in person. Interviewees will be advised of the format and schedule in advance. Failure to appear to interview will be considered non-responsive, and Firm will be eliminated from any further consideration. The County will issue Notice of Intent to Award to most qualified firm and enter into negotiations. If an acceptable Agreement cannot be reached with the highest ranked Firm, the County may proceed to negotiate with the next highest ranked Firm, and so on, until an acceptable Agreement is negotiated, or the County, in its sole discretion, elects to terminate the solicitation. Upon completion of negotiations a pre-construction services agreement will be signed by both parties. For additional information, please contact: Project Manager: Rosaura T. Gallagher E-Mail: rtgallagher@washoecounty.gov Phone: 775-328-2046

Pre-Construction/Negotiated

Water / Sewer

$30,000,000.00

Public - County

Site Work

125

43

8

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
32
Bidding Soon
367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

December 1, 2025

Project location map

Pleasant Valley Dr, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.