Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated August 12, 2025
Site work for a water / sewer project in Reno, Nevada. Completed plans call for site work for a water / sewer project.
Question Cuttoff Date & Time 7/17/2025at 2:00 pm Bids for all labor, materials, equipment, and incidentals required for the replacement of approximately 2,600 feet of 12" cast iron main with 12" ductile iron main on Pyramid Way from Nugget Avenue to Prater Way. Approximately 1,300 feet of 12" cast iron will be retired in place and 1,800 feet of 12" cast iron will be removed. This Project is deemed a Horizontal Construction Project. Anticipated Start Date:on or Before June 23, 2025 Completion Deadline: February 20, 2026 Range for Engineer's Estimate: $2,184,300 - $2,669,700 TMWA reserves the right to reject any or all bids, including without limitation the right to reject any or all non-conforming, nonresponsive, unbalanced, or conditional bids, and to reject the bid of any bidder if TMWA believes that it would not be in the best interest of TMWA to make an award to that bidder. TMWA also reserves the right to waive informalities. Bids will be evaluated as prescribed in Nevada Revised Statute 338.147. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Awarded 6/9/2025 The project makes several improvements to the water distribution system. The project highlights include but are not limited to the following items: 1. Installation of approximately 2,745 LF 12-in restrained joint and poly wrapped ductile iron pipe. 2. Installation of approximately 456 LF 6-in restrained joint and poly wrapped ductile iron pipe. 3. Installation of approximately 20 LF 8-in restrained joint and poly wrapped ductile iron pipe. 4. Approximately 40 service tie-overs to the new main. 5. Grout filling/retire in place of approximately 1,072 LF 12-in cast iron pipe. 6. Removal of approximately 2,045 LF 12-in cast iron pipe. C. The Work is located at the following location(s): 1. City of Sparks, Washoe County, Nevada, generally in the area of Pyramid Way between Prater Way and Nugget Ave. The work is contained within streets and public right-of way owned by NDOT and the City of Sparks.
Award
Water / Sewer
$2,388,165.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
September 22, 2025
Pyramid Wy, Reno, NV
Related To This Project
Reno, NV
Bid Date: Jun 04 2025
Reno, NV
--
Reno, NV
Bid Date: Jun 17 2025
Reno, NV
Bid Date: Jun 24 2025
Reno, NV
Bid Date: Jun 12 2025
Reno, NV
Bid Date: Jun 17 2025
Reno, NV
Bid Date: Jul 25 2025
Reno, NV
Bid Date: Jun 12 2025
Reno, NV
Bid Date: May 29 2025
Reno, NV
Bid Date: May 28 2025
Reno, NV
Bid Date: Jul 03 2025
Reno, NV
Bid Date: Jul 01 2025
Reno, NV
Bid Date: Jun 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
