BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work and paving for a mixed-use development in Milliken, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000386058 This project consists of the reconstruction of Center Drive from WCR 23 3/4 east 2,750' to Town limits. Improvements consist of removing 10,425 SY of existing asphalt. Installation of 9,836 SY Class 6 road base, 3,174 tons of hot mix asphalt, 5,784 SY concrete sidewalks, 4,759 LF vertical curb & gutter, 1,298 LF RCP, 10 type R inlets and 5803 CY of unclassified excavation. Bonding Requirements - Bid Bond 5 % Each Proposal must be accompanied by a Proposal Guaranty consisting of a properly Certified Check, Cashier's Check or Bid Bond, in the amount of five (5) percent of contractor's bid proposal, without conditions, payable to the Town of Milliken. Proposal Guaranties consisting of bid bonds will be retained by the Town of Milliken. The Proposal Guaranties consisting of Certified Checks and Cashier's Checks, accompanying the three lowest Proposals may be held until the contract is awarded, provided the time from bid opening to contract award does not exceed thirty days. The Certified Checks and Cashier's Checks accompanying the other Proposals will be returned promptly after the opening and verification of the Proposals. Question Deadline 05/23/2025 at 5:00 PM MT Questions are submitted online No Please direct questions on bidding procedures and technical questions about the project work to Jon Rabas, Streets Director, at JRabas@millikenco.gov. The Town of Milliken reserves the right to reject any or all Proposals. The Proposal and Proposal Guaranty must be placed in one envelope (separate for each project bid) securely sealed therein and labeled, unless submitted electronically: FIRM'S NAME PROPOSAL FOR THE Center Drive Improvements RFP 05-2025

Award

Roads / Highways

$2,450,200.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
116
Bidding Soon
1,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

July 10, 2025

Project location map

Center Dr, Milliken, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.