BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work for a water / sewer project in Morgan Hill, California. Conceptual plans call for site work for a water / sewer project.

The purpose of this project is to either replace or construct larger storage tanks to accommodate growth and increase water storage capacity. The tanks that will be increased in size include the following: Boys Ranch (1.20 MG), Glen Ayre (0.25 MG), and Woodland 2 (0.25 MG). Except for the Edmondson site where a second tank (0.90 MG) will be added, the other sites will have new tanks with the current volume; those sites are Llagas (0.2 MG), and Jackson Oaks (0.2 MG). Those facilities are referred to in the 2021 Water System Master Plan as BR-T1, GA-T1, WD-T1, ED-T1, LI-T1, and JO-T1. Those projects will be built in phases. Upgrading the road access to the EL Toro reservoir is included as part of the reservoir projects. A preliminary cost of $500,000 is estimated in the budget for this purpose. As of May 05, 2025 ,This project is included in the city's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$9,600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
152
Bidding Soon
2,489
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

Project location map

Multiple Locations, Morgan Hill, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.