BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work for a water / sewer project in Morgan Hill, California. Conceptual plans call for site work for a water / sewer project.

The 2021 Water System Master Plan recommended the installation of new water mains to relieve water system deficiencies and increase the hydraulic reliability of the system. The projects consist of installations of new or replacement of existing water mains. The Projects scheduled for initiation in FY 2025-26 are Master Plan Projects NH-P3, NH-P4 and BR-P4. The projects scheduled for initiation in FY 2027-28 are NH-P1 and NH-P2-BR-P4 -replacement of 450 LF of existing 8 main with a 10 main on Mission View Dr. between Cochrane Rd and 2,100 Northwest of Cochrane Rd.- NH-P1-replacement of 950 LF of existing 4 main with 8 main on Spring Avenue between Del Monte Ave to Monterey Rd. NH-P2 - replacement of 550 LF of existing 10 main with 16 main on San Pedro Ave. between Butterfield Blvd and Railroad Ave. NH-P3 - replacement of 350 LF of existing 1 main with 16 main on Railroad Ave. between San Pedro Ave to approx600n/o Mast St. NH-P4 - replacement of 600 LF of existing 6 main with 16 main on Railroad Ave. approx. 600 n/o Mast St. to Mast St. As of May 05, 2025 ,This project is included in the city's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,030,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
131
Bidding Soon
2,507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

Project location map

Multiple Locations, Morgan Hill, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.