BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 13, 2025

Site work, remodeling and renovation of an educational facility in Horton, Kansas. Completed plans call for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

A. Summary Project Description: Restroom Remodels including but not limited to: new restroom fixtures, plumbing, ceilings, paint, flooring, sheetrock, demolition, and lighting. B. Contract Scope: Construction, demolition, and renovation. C. Contract Terms: Lump sum (fixed price, stipulated sum). Question Deadline 05/19/2025 Direct questions to Echelon's Project Manager, email; Alex@echelonad.com Notice to Proceed: Within 30 days The Owner reserves the right to change the schedule or terminate the entire procurement process at any time. Bid Bond of a sum no less than 5 percent of the Bid Amount High school 1120 1ST AVE. E HORTON, KS 66439 Middle school 221 S 7TH ST. EVEREST, KS 66424 The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to complete the work as shown on the plans and specifications. The overall Project scope consists of seven Bid Packages as described in numbers 2 - 8 below. Bid Package No. 1 is optional and is only required of a contractor that wishes to bid for the overall coordination and completion of the Work in its entirety as shown in the plans and specifications. o Bid Package No. 1: General Contract - FOR GENERAL CONTRACTORS ONLY 1. All labor, equipment, and materials necessary to coordinate and ensure the completion of Bid Packages 2 through 8. Manage communications such as RFIs, Supplemental Information, Progress Meetings. Manage financial matters such as Payment Applications and Change Orders. Manage schedule and coordinate efforts of separate Bid Package Contractors. o Bid Package No. 2: Demolition 1. All labor, equipment, materials, and services necessary to remove existing equipment, fixtures, accessories, toilet partitions, and wall, floor, and ceiling finishes as necessary to prepare for new work. Provide dustproof partitions. Remove abandoned pipe, ducts, and conduits back to source and cap stubs and tag. Protect existing work to remain and ensure existing active systems remain in operation and are accessible. Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 3: Flooring 1. All labor, equipment, materials, and services necessary to prepare existing subfloor and install new tile flooring and wall base. Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 4: Gypsum Board Assemblies 1. All labor, equipment, materials, and services necessary to remove damaged or unacceptable existing gypsum board, then patch and repair, and install new, gypsum board assemblies. Provide and install Rigid Sheet Wall Protection. Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 5: Acoustical Ceilings 1. All labor, equipment, materials, and services necessary to install new acoustical ceiling systems, including moldings, trim, and accessories. Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 6: Plastic Toilet Compartments 1. All labor, equipment, materials, and services necessary to install new HDPE toilet compartments, including accessories. Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 7A: Toilet Accessories, 7B: Wall Protection Bidders may bid 7A or 7B, or a combined bid of both. 7A. All labor, equipment, materials, and services necessary to install new ADA grab bars and new mirrors. Remove all debris from site and leave premises in clean condition, ready for subsequent work. 7B. All labor, equipment, materials, and services necessary to install new wall protection (corner guards). Remove all debris from site and leave premises in clean condition, ready for subsequent work. o Bid Package No. 8: Interior Lighting 1. All labor, equipment, materials, and services necessary to install new luminaries. Install electrical conduit, wiring, switches, controls, connectors, hardware, supports, trims, and accessories. Remove all debris from site and leave premises in clean condition, ready for subsequent work. Elementary school 300 E 16TH STREET HORTON, KS 66439 The Owner reserves the right to change the schedule or terminate the entire procurement process at any time

Post-Bid

Educational

$300,000.00

Public - City

Remodeling, Renovation, Site Work

18

15

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
69
Bidding Soon
1,086
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

Multiple Locations, Horton, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.