Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated June 21, 2025
Demolition, site work, paving and new construction of a mixed-use development in South Holland, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Description: Bridge Replacements South 170th Street over Thorn Creek and 143rd Street over Tinley Creek 24-BREPS-00-BR Routes No B59 and B80 COOK COUNTY PROCUREMENT CONTRACT NO.: 2511-04170 LOCATION OF IMPROVEMENT The proposed improvements are part of the public highway system in the County of Cook, State of Illinois, located by section and routes before mentioned, and is indicated on the map showing the County Highway System on file in the office of the County Clerk and also in the office of the Illinois Department of Transportation, Division of Highways, Springfield, Illinois. 170th Street Over Thorn Creek The proposed improvement begins near 1-94 at Station 115+12 on the centerline of 170th Street and extends in an easterly direction for 2,738 feet (0.52 miles). The project is located within the Village of South Holland in Cook County, Illinois. 143rd Street Over Tinley Creek - The proposed improvement is located in unincorporated Bremen Township, Illinois, in Cook County. The project limits extend approximately 500 ft. east and west of the bridge carrying 143rd Street over Branch of Tinley Creek. The bridge is located approximately 1,400 ft. east of Ridgeland Avenue. The project spans a length of 0.22 miles (1,150 ft.). DESCRIPTION OF IMPROVEMENT 170th Street Bridge Over Thorn Creek The improvement consists of complete superstructure and substructure removal and replacement, pavement reconstruction, pavement patching, pavement resurfacing, curb and gutter replacement, pavement marking, sidewalk construction, lane reconfiguration, curb ramp improvements, and other appurtenant work as required to complete the improvement. 143rd Street Over Tinley Creek The improvement consists of complete superstructure and substructure removal and replacement. The existing raised median will be removed and replaced with a painted median. The existing barrier wall and south parapet will be replaced, and the existing north parapet will be replaced with a metal railing. Also included in the improvements are storm sewer structure cleaning and adjusting, pavement patching, landscaping, signing, pavement marking, traffic protection and all other work as required to complete the improvement. BID DEPOSIT: Each bid shall be accompanied by a copy of a bid bond, cashier's check, or a properly certified check for not less than 5% of the amount of the bid on this contract. Questions: Questions can be submitted in writing to the contact person above by 3:00 p.m. Local Time Chicago on Friday, May 16, 2025. Bid Due Date, Time, and Location: Wednesday, May 28, 2025 at 10:00 a.m. Local Time Chicago. MWBE Goals: 24% MBE, 7% WBE Bridge Replacements South 170 th Street over Thorn Creek and 143 rd Street over Tinley Creek 24-BREPS-00-BR Routes No B59 and B80
Bid Results
Bridges / Tunnels
$13,855,985.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2025
June 27, 2025
Multiple Locations, South Holland, IL
Related To This Project
South Holland, IL
Bid Date: May 22 2025
South Holland, IL
Bid Date: May 28 2025
South Holland, IL
--
South Holland, IL
Bid Date: Sep 08 2025
South Holland, IL
Bid Date: Oct 22 2025
South Holland, IL
Bid Date: Dec 05 2025
South Holland, IL
--
South Holland, IL
Bid Date: Dec 03 2025
South Holland, IL
Bid Date: May 20 2021
South Holland, IL
Bid Date: Mar 25 2025
South Holland, IL
Bid Date: Feb 25 2025
South Holland, IL
Bid Date: Feb 20 2025
South Holland, IL
Bid Date: Mar 07 2025
South Holland, IL
Bid Date: Feb 25 2025
South Holland, IL
Bid Date: Jan 06 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
