BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Demolition, site work, paving and new construction of a mixed-use development in South Holland, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Description: Bridge Replacements South 170th Street over Thorn Creek and 143rd Street over Tinley Creek 24-BREPS-00-BR Routes No B59 and B80 COOK COUNTY PROCUREMENT CONTRACT NO.: 2511-04170 LOCATION OF IMPROVEMENT The proposed improvements are part of the public highway system in the County of Cook, State of Illinois, located by section and routes before mentioned, and is indicated on the map showing the County Highway System on file in the office of the County Clerk and also in the office of the Illinois Department of Transportation, Division of Highways, Springfield, Illinois. 170th Street Over Thorn Creek The proposed improvement begins near 1-94 at Station 115+12 on the centerline of 170th Street and extends in an easterly direction for 2,738 feet (0.52 miles). The project is located within the Village of South Holland in Cook County, Illinois. 143rd Street Over Tinley Creek - The proposed improvement is located in unincorporated Bremen Township, Illinois, in Cook County. The project limits extend approximately 500 ft. east and west of the bridge carrying 143rd Street over Branch of Tinley Creek. The bridge is located approximately 1,400 ft. east of Ridgeland Avenue. The project spans a length of 0.22 miles (1,150 ft.). DESCRIPTION OF IMPROVEMENT 170th Street Bridge Over Thorn Creek The improvement consists of complete superstructure and substructure removal and replacement, pavement reconstruction, pavement patching, pavement resurfacing, curb and gutter replacement, pavement marking, sidewalk construction, lane reconfiguration, curb ramp improvements, and other appurtenant work as required to complete the improvement. 143rd Street Over Tinley Creek The improvement consists of complete superstructure and substructure removal and replacement. The existing raised median will be removed and replaced with a painted median. The existing barrier wall and south parapet will be replaced, and the existing north parapet will be replaced with a metal railing. Also included in the improvements are storm sewer structure cleaning and adjusting, pavement patching, landscaping, signing, pavement marking, traffic protection and all other work as required to complete the improvement. BID DEPOSIT: Each bid shall be accompanied by a copy of a bid bond, cashier's check, or a properly certified check for not less than 5% of the amount of the bid on this contract. Questions: Questions can be submitted in writing to the contact person above by 3:00 p.m. Local Time Chicago on Friday, May 16, 2025. Bid Due Date, Time, and Location: Wednesday, May 28, 2025 at 10:00 a.m. Local Time Chicago. MWBE Goals: 24% MBE, 7% WBE Bridge Replacements South 170 th Street over Thorn Creek and 143 rd Street over Tinley Creek 24-BREPS-00-BR Routes No B59 and B80

Bid Results

Bridges / Tunnels

$13,855,985.00

Public - County

Demolition, New Construction, Paving, Site Work

24

9

5

6

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
500
Active Projects
289
Bidding Soon
3,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

Multiple Locations, South Holland, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.