BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 14, 2025

Site work and new construction of a laboratory facility in Storrs Mansfield, Connecticut. Conceptual plans call for the construction of a 15,500-square-foot laboratory facility; and for site work for a laboratory facility.

The purpose of this Request for Qualifications ("RFQ") is to solicit experienced architectural design firms to provide architectural design services for the new High-Powered Engineering Lab Building. This project will encompass the building of a new 15,500 GSF modular/prefabricated facility intended to house: the Materials Science & Engineering (MSE) Foundry and Advanced Materials Processing Lab, the Connecticut Power Electronics Center for Excellence (CONPEX), space for future research (which may or may not be determined by the time design commences), and various collaboration/support spaces. Building location: K Lot on Discovery Drive. SBE/MBE PARTICIPATION: The University of Connecticut is committed to providing a professionally inclusive environment within which small and minority businesses are encouraged to participate in the procurement experience. As such, we encourage participation by Small (SBE) businesses, Minority-Owned (MBE) businesses, Woman-Owned (WBE) businesses, and businesses owned by persons with a disability (DisBE), certified as such by the Connecticut's Department of Administrative Services Supplier Diversity Division. Q&A (RFI) Due Date and Time 5/21/2025 2:00 pm All Requests for Information ("RFI") questions are to be posted under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. PROJECT SCHEDULE/DURATION: Anticipated Contract Issuance/Notice to Proceed: September 15, 2025 Schematic Design Completion: November 14, 2025 Construction is planned to start: TBD Construction Duration: 12 Months The method of Contractor Selection has not been Determined at this time.

Conceptual

Laboratories

$12,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
720
Active Projects
274
Bidding Soon
5,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

Project location map

Discovery Dr, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.