Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

A. The Work of Project is defined by the Contract Documents and consists of the following B. Work covered by Contract Documents 1. The project is primarily being undertaken to replace sanitary risers within the North and South shower rooms. To facilitate this work, the existing showers and all finishes within the shower rooms will be removed and replaced. In addition, shower changing compartments will be added to each shower stall for privacy. The typical layout currently includes 5 shower stalls which will be reduced to 4 shower stalls to accommodate the added changing compartments C. Related Work provided under separate contract: 1. Additional work scope under separate contracts: Cooperate fully with contractors that may have been issued separate contract(s) to perform certain construction operations at the site prior to construction activity under this contract so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts. The purpose of this Invitation to Bid ("ITB") is to solicit bids for the Holcomb Hall Bathroom Renovations project. This project entails the renovation of the shower areas of the Holcomb Residence Hall bathrooms(six bathrooms), as well as the replacement of the vertical plumbing riser piping serving the showers. Scope Review Meeting (with lowest qualified Bidder) 5/1/2025 2:00 PM Question Deadline 04/17/2025 at 2:00 PM ET All Requests for Information ("RFI") questions are to be posted electronically. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. The construction is planned to start: May 26, 2025 Substantial completion: August 19, 2025 Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

33

13

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
896
Active Projects
450
Bidding Soon
4,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 19, 2025

Project location map

352 Mansfield Rd, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.