BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work and paving for a bridge / tunnel in Boise, Idaho. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

In accordance with the plans and specifications, this work shall consist of rehabilitation of the following existing bridge structures: 1. Bethel Court Bridge (#2065): * Perform repairs on the top deck spanning over the Ridenbaugh Canal and North of Franklin Road. * Includes concrete repairs and epoxy overlay. 2. Healey Road Bridge (#2149) (over New York Canal.): * Conduct bridge deck maintenance including repair of expansion joints. * Address concrete cracking and perform surface repairs on the piers and caps of the structure. 3. Vista Avenue Bridge (#2165): * Located North of Elder Street, spanning the New York Canal. * Undertake rehabilitation of the existing bridge deck, concrete repairs and epoxy overlay. * Repair the expansion joint located at the South end of the bridge. * Perform concrete surface repairs on the bridge girders. The work shall be completed in its entirety on or before December 31, 2025. Project Number: 225005, 225006, 225007 GIS Number: 210139, 210129, 210249 Project Location: Boise, Idaho The completion dates are predicated on the intent of ACHD to issue a Notice to Proceed to the Contractor on or about June 23, 2025. ACHD shall be entitled to Liquidated Damages of $1,500.00 for each calendar day of delay in the completion of the work. A delay on one portion of the project does not justify delays on other portions of the project. All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the online. All questions or clarifications must be submitted by 12:00 pm on Monday, May 19, 2025. Question Submission Deadline:May 19, 2025, 12:00pm Question Response Deadline:May 20, 2025, 4:30pm Any interpretation that may alter or change the ITB will be in writing, in the form of Addenda, which will be furnished via the eProcurement Portal. It is the Bidder's responsibility to check for Addenda before submitting bids. Proposals must be accompanied by an original or photocopy or electronic version, e.g. PDF, FAX, etc. of certified check, cashier's check, or a bid bond (collectively referred to hereafter as "Bid Security") issued by a surety authorized to issue such bonds in the State of Idaho, in an amount of ten percent (10%) of the total amount of the proposal submitted. The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD.Award of a contract pursuant to this invitation may be delayed, without penalty, for up to sixty (60) calendar days after the date of bid.

Bid Results

Bridges / Tunnels

$404,591.00

Public - County

Paving, Site Work

21

6

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
17
Bidding Soon
289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 23, 2025

Project location map

Multiple Locations, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.