BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000293082 Any enquiries concerning submitting through MERX should be addressed to: MERX Customer Support Phone: 1-800-964-6379 Email: merx@merx.com The Contractor shall not commence the Work on the Site before July 21, 2025, and shall commence the Work on Site no later than July 28, 2025, as directed by the Contract Administrator and weather permitting. The Work to be done under the Contract shall consist of: (a) Pavement Rehabilitation (i) Eastbound Portage Avenue from David Street to Cavalier Drive. (b) Mill & Fill (i) Eastbound Portage Avenue from Cavalier Drive to Westwood Drive; (ii) Eastbound Portage Avenue from Banting Drive to Sturgeon Road; and (iii) Westbound Portage Avenue from Sturgeon Road to Cavalier Drive. The major components of the Work are as follows: (a) Pavement Rehabilitation (i) Planing existing asphalt overlay; (ii) Full depth concrete repairs of existing joints and slabs; (iii) Renewal of existing curbs; (iv) Construction of separate concrete splash strip; (v) Installation of new catch basins and leads; (vi) Adjustment of existing catch basins, manholes, and appurtenances; (vii) Placement of asphalt overlay (Type MS1, average thickness 90 mm); (viii) Renewal sidewalk; and (ix) Topsoil and sod (b) Mill & Fill (i) Planing existing asphalt overlay; (ii) Full depth concrete repairs of existing joints and slabs; (iii) Renewal of existing curbs; (iv) Construction of separate concrete splash strip; (v) Adjustment of existing catch basins, manholes, and appurtenances; (vi) Placement of asphalt overlay (Type MS1, average thickness 65 mm); (vii) Renewal of existing sidewalks; and (viii) Topsoil and Sod The Bidder shall include in their Bid Submission bid security in the form of a digital bid bond, in the amount of at least ten percent (10%) of the Total Bid Price. A performance bond of a company registered to conduct the business of a surety in Manitoba, Form_H1_Performance_Bond in the amount of fifty percent (50%) of the Contract Price A labour and material payment bond of a company registered to conduct the business of a surety in Manitoba Form_H2_Labour_and_Material_Bond, in an amount equal to fifty percent (50%) of the Contract Price. The Award Authority may reject all or any part of any Bid, or waive technical requirements or minor informalities or irregularities, if the interests of the City so require.

Bid Results

Roads / Highways

$4,382,227.00

Public - City

Paving, Site Work

40

7

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
1
Bidding Soon
291
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

July 21, 2025

Project location map

Multiple Locations, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.