Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 10, 2025
Site work for a water / sewer project in Tullytown, Pennsylvania. Completed plans call for site work for a water / sewer project.
Tullytown ARPA Stormwater Repairs If you have any questions, please contact our consultant engineer Mark Bickerton, PE Pennoni Associates Inc. 1501 Main Street, Suite 220 Warrington, PA 18976 (215) 589-6025 mbickerton@pennoni.comvt Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. A performance bond or certified check in the amount of 100% of the contract shall be furnished by the successful bidder within 20 days after the contract is awarded. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same. This project involves PennDOT road occupation, excavation, inlet repairs/replacement, road restoration, landscape restoration, and minor grading. This project is subject to prevailing wage rates in accordance with Pennsylvania Department of Labor and Industry. Liquidated damages apply at the rate of $1,000.00 per calendar day. The project is grant-funded, and compliance with grant requirements, including specific documentation for payment, is required per the contract at the request of the Borough Engineer. Bids must be submitted unconditionally. No bidder may withdraw bid within sixty (60) days after the scheduled closing time for receipt of bids. The Owners reserve the right to waive any informalities, or to reject any or all bids. Scope of Work: The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and described in the Specifications entitled: TULLYTOWN ARPA STORMWATER REPAIRS prepared by Pennoni Associates Inc., Consulting Engineers, 1501 Main Street, Suite 220, Warrington, PA 18976, acting as and in these Contract Documents, entitled the Engineer, and shall do everything required by the Agreement and the Contract Documents.
Bid Results
Water / Sewer
$54,250.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
June 30, 2025
Multiple Locations, Tullytown, PA
Related To This Project
Tullytown, PA
Bid Date: Aug 12 2025
Tullytown, PA
Bid Date: Mar 18 2025
Tullytown, PA
Bid Date: Jun 27 2024
Tullytown, PA
Bid Date: Jul 26 2022
Tullytown, PA
Bid Date: May 24 2023
Tullytown, PA
Bid Date: Feb 23 2023
Philadelphia, PA
Bid Date: Aug 22 2025
Fairfield, PA
--
Harrisburg, PA
Bid Date: Jun 04 2025
Belle Vernon, PA
Bid Date: May 21 2025
Eldred Township, PA
Bid Date: May 16 2025
Mifflinburg, PA
Bid Date: May 16 2025
New Bethlehem, PA
Bid Date: May 06 2025
Williamsport, PA
Bid Date: May 15 2025
West Mifflin, PA
Bid Date: May 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
