BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work for a water / sewer project in Puyallup, Washington. Completed plans call for site work for a water / sewer project.

**As of June 5, 2025, the project was awarded to Pape and Sons but the awarded amount is not available.** All bid proposals shall be in accordance with the Instructions to Bidders and all other contract documents. Any questions concerning the description of the work contained in the contract documents must be directed in written form only to John Lewis Wright III, P.E., by email at jwright@parametrix.com prior to bid opening date. Any questions concerning the bid documents, award documents, bonds, and insurance must be directed in written form only to Sean Vance, by email at sean@valleywaterdistrict.com prior to bid opening date. All bids will be tabulated and bid results will be E-mailed to every bidder and posted on Builder's Exchange for this Request for Bids. All bid proposals shall be accompanied by a bid deposit by a cashier's or certified check, or Bid Bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into a contract and furnish a satisfactory Performance Bond within the time stated in the specifications, the bid deposit or bond shall be forfeited to the Valley Water District. Valley Water District Alderwood Estates Water Main and Service Line Replacement Project This Contract provides for water main improvements within the Valley Water District. The project is located within Pierce County right-of-way. Work will consist of furnishing and installing up to 195 residential service line replacements, approximately 3,150 linear feet of 8-Inch ductile iron water main, and approximately 305 linear feet of 2-inch polyline water main, and all associated water system materials including water main, fittings, valves, fire hydrants, and water service materials, as well as traffic control and surface restoration, and material testing. The Contractor shall complete all work within 90 working days. The Valley Water District reserves the right to reject any and all bids, waive any informalities or minor irregularities in the bidding, and determine which bid or bidder meets the criteria set forth in the bid documents. No bidder may withdraw his bid after the hour set for the opening thereof unless the award is delayed for a period exceeding ninety (90) days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
3
Bidding Soon
930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

Multiple Locations, Puyallup, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.