BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2025 at 8:00 PM

Updated July 1, 2025

Site work and paving for a mixed-use development in Baton Rouge, Louisiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Grading, earthwork, ADA ramps, pervious concrete, Portland cement concrete, concrete driveways, traffic signals, striping including parking lot, and related items of work. Bids, amendments to bids, or request for withdrawal of quotations, received after time specified for bid opening shall not be considered for any cause whatsoever. Bids shall be firm for a period of forty five (45) days from the date of the opening of bids and no bid shall be withdrawn for any reason during this period of time except as allowed per R.S. 38:2214.C. A Certified Check or Cashier's Check, payable to the Parish of East Baton Rouge or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total bid, shall be submitted with each bid. For additional information please contact Mr. George Chike, P.E., by email at gchike@brla.gov or Mr. Henok Abebe, Project Manager at h.abebe@ilsiengineering.com

Bid Results

Sidewalks / Parking Lot

$843,376.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
2
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

S Sherwood Forest Blvd, Baton Rouge, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.