Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2025 at 8:00 PM
Updated July 1, 2025
Site work and paving for a mixed-use development in Baton Rouge, Louisiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Grading, earthwork, ADA ramps, pervious concrete, Portland cement concrete, concrete driveways, traffic signals, striping including parking lot, and related items of work. Bids, amendments to bids, or request for withdrawal of quotations, received after time specified for bid opening shall not be considered for any cause whatsoever. Bids shall be firm for a period of forty five (45) days from the date of the opening of bids and no bid shall be withdrawn for any reason during this period of time except as allowed per R.S. 38:2214.C. A Certified Check or Cashier's Check, payable to the Parish of East Baton Rouge or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total bid, shall be submitted with each bid. For additional information please contact Mr. George Chike, P.E., by email at gchike@brla.gov or Mr. Henok Abebe, Project Manager at h.abebe@ilsiengineering.com
Bid Results
Sidewalks / Parking Lot
$843,376.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
July 28, 2025
S Sherwood Forest Blvd, Baton Rouge, LA
Related To This Project
Baton Rouge, LA
Bid Date: May 13 2025
Baton Rouge, LA
Bid Date: May 28 2025
Baton Rouge, LA
Bid Date: May 14 2025
Baton Rouge, LA
Bid Date: May 23 2025
Baton Rouge, LA
Bid Date: May 30 2025
Baton Rouge, LA
Bid Date: May 28 2025
Baton Rouge, LA
Bid Date: Jun 04 2025
Baton Rouge, LA
--
Baton Rouge, LA
Bid Date: Jun 17 2025
Baton Rouge, LA
Bid Date: May 22 2025
Baton Rouge, LA
Bid Date: May 28 2025
Baton Rouge, LA
Bid Date: Jul 01 2025
Baton Rouge, LA
Bid Date: May 21 2025
Baton Rouge, LA
Bid Date: May 06 2025
Baton Rouge, LA
Bid Date: May 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
