BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated November 7, 2025

Site work for a water / sewer project in Malibu, California. Completed plans call for site work for a water / sewer project.

**As of October 29, 2025 , this project has not yet been awarded. The project is expected to be awarded on November 10th, 2025.** In general, the proposed improvements consist of repairing an existing 60-inch corrugated metal pipe (CMP) using a spiral wound polyvinyl chloride (PVC) profile method, hydrojetting the existing pipe and improved pipe, and a closed-circuit television (CCTV) inspection of the pipe and all other appurtenant work included and shown in the Contract Documents and Specifications In accordance with the provisions of Division 2, Part 7, Chapter 1 of the California Labor Code, the California Department of Industrial Relations has established the general prevailing rates of per diem wages for each craft, classification and type of work needed to execute contracts for public works and improvements. The per diem wages published at the date the contract is advertised for bids shall be applicable. Bidders shall provide a properly executed Bidder's Bond (contained herein), cashier's check or other bidder's security payable to the City to accompany the bid in the amount of ten percent (10%) of the total bid. Faithful Performance Bond Requirement - The bidder to whom the Contract is awarded (Contractor) shall execute the Contract and furnish a surety bond in the amount of 100% of the Contract bid price guaranteeing the faithful performance of the Contract. The bond shall remain in force for a period of one year after the date of recordation of Notice of Completion by City. The bond shall be sufficient and duly executed by a surety admitted to do business in the State of California. Material Suppliers and Laborer Bond Requirement - The Contractor shall furnish a surety bond by an admitted surety in the amount of 100% of the Contract bid price to secure the payment of claims for materials and labor provided by others in performing the work. The bond shall be sufficient and duly executed by a surety admitted to do business in the State of California. The City reserves the right to retain all bids for a period of 90 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to determine and waive non substantial irregularities in any bid, and to reject any or all bids. The bid shall be balanced so that each bid item is priced to carry its share of the cost of the work and also its share of the contractor's overhead and profit.

Bid Results

Water / Sewer

$377,825.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
4
Bidding Soon
1,722
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

December 9, 2025

Project location map

Encinal Canyon Rd, Malibu, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.