Published June 9, 2025 at 8:00 PM

Updated June 11, 2025

Site work and paving for a sidewalk / parking lot in Ogdensburg, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reconstruction of Parking Lot at 1301 Jay Street Question Deadline 06/06/2025 Prospective Bidders may request clarifications of the bidding documents at other times from the Architect by sending their written questions to Anastasia Thomas, AIA at 315.268.1338 or Emailing to athomas@labellapc.com no later than three days prior to bid due date. Owner may release addendums up to two days prior to the bid due date, with the exception of an addendum changing the bid due date. All bids must be written in ink on the forms provided. Bids must be accompanied by bid security equal to five percent (5%) of the amount of the bid, in the form of a certified check, drawn upon a national or state bank or trust company to the order of "City of Ogdensburg Housing Authority", or a bond from a surety company licensed in the state of New York, with sufficient sureties in a penal sum, and holding certificates of authority in compliance with 31 CFR part 223 Surety Companies Doing Business with the United States., conditioned that if Bidder's proposal is accepted, bidder will enter into a contract for the same, and will execute separate Performance Bond and Labor and Materials. Bond each equal to one hundred percent (100%) of the Contract Amount. Bid Bonds and Performance Bond and Labor and Materials Bond shall be obtained from Surety Companies with a Best Rating of A (excellent or better) and holding certificates of authority in compliance with 31 CFR part 223 Surety Companies Doing Business with the United States. Bids must be accompanied by a completed Statement of Surety's Intent. If the selected Bidder fails to sign the Contract and deliver the required bonds, he shall be subject to forfeiture of the bid security. If Bidder's proposal is accepted, bidder will enter into a contract for the same, and will execute separate Payment and Performance Bond each equal to one hundred percent (100%) of the Contract Amount Payment and Performance Bond shall be obtained from Surety Companies with a Best Rating of A (excellent or better). The date of substantial completion for the work shall be no later than 10 March 2026, A penalty of one hundred dollars ($100.00) per day may be assessed for late substantial completion. Ogdensburg Housing Authority reserves the right to consider all bids for a period of not to exceed forty-five (45) days following the bid opening before awarding the Contract, during which period bids shall not be withdrawn, and reserves the right to reject any or all bids, to waive any informality in the bids, and to award the Contract in the Owner's best interest. Bid date description: Sealed bids shall be marked 'Ogdensburg Housing Authority- Parking Lot Reconstruction-Jay Street. Emailed bids are also acceptable and must be sent to chasford fogdensburgha.com, athomas@labellapc.com and tcassell@labellapc.com. Particular project requirements: 1. Existing site conditions and restrictions: Access to work area shall be coordinated with Owner, including location for storage of material and parking. Note that Contractor will be responsible for all waste handling and disposal. 2. Occupancy of adjacent facilities: Provide necessary barriers to protect public from the work area. 3. Salvage: None. 4. Power for work: Owner cannot guarantee access to power. Contractor must plan accordingly. D. Permits and Fees: Contractor to obtain the Building Permit and Certificate of Completion/Occupancy and pay all fees associated with it. Contractor shall submit copies of Building Permit and Certificate of Completion/Occupancy to Architect and owner. E. Codes: Comply with applicable codes and regulations of authorities having jurisdiction. Submit copies of inspection reports, notices and similar communications to Owner. F. Dimensions: Verify dimensions indicated on drawings with field dimensions before fabrication or ordering of materials. Do not scale drawings. G. Existing Conditions: Notify Architect of existing conditions differing from those indicated on the drawings. Do not remove or alter structural components without prior written approval. H. Coordination: 1. Coordinate the work of all trades under your contract. 2. Coordinate with other contracts to ensure scheduling and work efficiency 3. Verify location of utilities and existing conditions.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

17

10

18

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
115
Bidding Soon
1,405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

1301 Jay St, Ogdensburg, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.