BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Renovation of a mixed-use development in Ogdensburg, New York. Completed plans call for the renovation of a educational facility; and transportation facility.

Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Each bidder must deposit with his bid, security in the form and subject to the conditions provided in the "INFORMATION FOR BIDDERS". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and to the minimum wage rates to be paid under the Contract. No bidder may withdraw his bid within 45 business days after the date of the opening of bids. Work under this Contract may generally be described to include, but not be limited to the following: Procurement; general requirements; joint sealers; & heavy duty vehicle fresh wash system (noted as NIC / by Others, and/or by Bus Wash Equipment Contractor) as indicated within Wash Bay 116 & Wash Equipment 117 on Building Number 2 Contract Drawing excerpts S100, S200, A100, A202, M100, P100, P101, P102, P103, P104, P105, E100, & E401 as described in the Contract Specifications, and as needed for a complete and proper project. Work shall include a complete drive through vehicle touchless wash system with spinner & rear arch having 14-ft clearance; high pressure pump; galvanized steel tire guides; PLC & HMI control package; photo eye activator; water holding tank; red/green entrance traffic light; natural gas water heater; water softener; 2-spinner chassis wash; lift rental; freight; receiving / unloading of shipments; installation with prevailing wages; and warranty. All concrete and related trenches by General Contractor. All field plumbing, mechanical, and electrical work by Plumbing Contractor, Mechanical Contractor, and Electrical Contractor, respectively. This outline is a general indication of the requirements of this Contract and is not intended to be all inclusive. The complete Contract Documents in their entirety, to include any and all addenda, form the basis of the responsibility of this Contract. Each contractor is advised that the specification sections in Division 1 - General Requirements apply distinctly to each Prime Contractor and the balance of the technical specifications apply to each Contractor (as appropriate) for the accomplishment of his work. All work of this contract shall be coordinated with other Prime Contractors involved in the project. All work shall additionally be coordinated with all other activities, construction, or others at each site throughout the progress of the work of this project. The Contractor shall use all means possible and shall be responsible for coordinating the installation of all materials of this Contract with work of all other trades involved with this project. All work shall be done in strict accordance with the Contract Documents and in compliance with all applicable Local, State and Federal Codes. Prior to the Bid Date of this project, the Contractor shall be completely responsible for visiting the project site to become completely familiar with the scope of this project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. It shall be completely understood that the use of asbestos containing materials in this project is strictly forbidden and all materials are provided in accordance with the Federal Asbestos Hazard Emergency Response Act (AHERA), and the New York State Asbestos Safety Act (SASA).

Post-Bid

Transportation Terminals

$210,000.00

Public - City

Renovation

24

15

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
115
Bidding Soon
1,405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 17, 2025

Project location map

Multiple Locations, Ogdensburg, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.