BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work for a water / sewer project in Ferndale, Washington. Completed plans call for site work for a water / sewer project.

Thornton To Newkirk Watermain Improvements Project. All technical questions regarding this project are to be sent to publicworks@cityofferndale.org, with the subject line reading "Thornton to Newkirk Project." The City of Ferndale, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This contract provides for the installation of approximately 500 linear feet of water main beginning at Thornton Street, then easterly to Newkirk Road (Base Bid). Base Bid work will include clearing and grubbing; removal of existing pavement; grading; installation of approximately 260 feet of 20" HDPE watermain casing using directional drilling (under I-5); installation of approximately 260 feet of 14" HDPE watermain carrier pipe inside the 20" HDPE casing; installation of approximately 180 feet of 12" ductile iron watermain. Work may also include the installation of approximately 630 linear feet of 12" ductile iron watermain from the west terminus of Newkirk Road, then easterly to Portal Way (Alternate A1). Alternate A1 work will include clearing and grubbing; pulverizing of existing pavement; grading. Other work will include placing of gravel base; hot mix asphalt; and other work, all in accordance with the Contract Plans, Special Provisions, the Standard Specifications, and Standard Plans Contract time shall begin on the mutually agreed upon start date between the Contracting Agency and the Contractor stated in the written Notice To Proceed provided to the Contractor. In no case shall the beginning of contract time be later than ***September 1, 2025***.

Award

Water / Sewer

$640,817.00

Public - City

Site Work

17

7

13

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
92
Bidding Soon
2,657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 7, 2025

Project location map

Multiple Locations, Ferndale, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.