Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and paving for a road / highway in Indiantown, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of November 5, 2025, the project is in design and construction has not been funded. A general contractor or a selection method has not been disclosed. Construction is expected to begin in July of 2030. FPID: 453333-2 SR 710 corridor from west of SE 126th Boulevard to Van Buren Avenue will be reconstructed from an existing 2-lane undivided roadway to a 4-lane divided roadway (two-lanes in each direction) from west of SE 126th Boulevard to FPL Power Plant Access Road in Martin and Okeechobee counties, a total distance of approximately 10.5 miles. SR 710 is identified as a strategic intermodal system (SIS) facility moving traffic east-west throughout Palm Beach, Martin and Okeechobee Counties The limit for this project is broken out into two segments. The limit of the first segment is SR 710 from Martin/Okeechobee County Line to FPL Power Plant Access Road (FPID: 453333-2-32-01) and the second segment extends from west of SE 126th Boulevard to Okeechobee/Martin County Line (FPID: 453333-3-32-01). The main work includes milling and resurfacing and reconstructing SR 710 to widening from two lanes to four lanes, provide new shoulders, shared use path and improvements to the following side streets: Tommy Clements Street, Farm Dairy Road, and SW Springhaven Ave. SR 710/SW Warfield Boulevard is a two-lane (one lane in each direction), undivided, north/south roadway with a posted speed limit of 60 mph. The corridor includes 12 ft travel lanes with flushed shoulders. The roadway has a functional classification of rural principal arterial. *The closed solicitation has been included below for reference: District : 04 Selection Method : Letter of Response and Interview Project Description : SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road Plain Language Description : Design Services for SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road. Advertisement Date 1/09/2024 Response Deadline Date/Time 1/24/2024 03:30 am Shortlist Selection Date/Time 2/12/2024 07:45 pm Final Selection Date/Time 3/18/2024 06:45 pm Negotiations Period Begin Date 3/23/2024 Negotiations Period Ending Date 5/25/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road
Design
Roads / Highways
$9,265,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
