BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work and paving for a road / highway in Indiantown, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 5, 2025, the project is in design and construction has not been funded. A general contractor or a selection method has not been disclosed. Construction is expected to begin in July of 2030. FPID: 453333-2 SR 710 corridor from west of SE 126th Boulevard to Van Buren Avenue will be reconstructed from an existing 2-lane undivided roadway to a 4-lane divided roadway (two-lanes in each direction) from west of SE 126th Boulevard to FPL Power Plant Access Road in Martin and Okeechobee counties, a total distance of approximately 10.5 miles. SR 710 is identified as a strategic intermodal system (SIS) facility moving traffic east-west throughout Palm Beach, Martin and Okeechobee Counties The limit for this project is broken out into two segments. The limit of the first segment is SR 710 from Martin/Okeechobee County Line to FPL Power Plant Access Road (FPID: 453333-2-32-01) and the second segment extends from west of SE 126th Boulevard to Okeechobee/Martin County Line (FPID: 453333-3-32-01). The main work includes milling and resurfacing and reconstructing SR 710 to widening from two lanes to four lanes, provide new shoulders, shared use path and improvements to the following side streets: Tommy Clements Street, Farm Dairy Road, and SW Springhaven Ave. SR 710/SW Warfield Boulevard is a two-lane (one lane in each direction), undivided, north/south roadway with a posted speed limit of 60 mph. The corridor includes 12 ft travel lanes with flushed shoulders. The roadway has a functional classification of rural principal arterial. *The closed solicitation has been included below for reference: District : 04 Selection Method : Letter of Response and Interview Project Description : SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road Plain Language Description : Design Services for SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road. Advertisement Date 1/09/2024 Response Deadline Date/Time 1/24/2024 03:30 am Shortlist Selection Date/Time 2/12/2024 07:45 pm Final Selection Date/Time 3/18/2024 06:45 pm Negotiations Period Begin Date 3/23/2024 Negotiations Period Ending Date 5/25/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road

Design

Roads / Highways

$9,265,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
3
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2030

Project location map

FL-710, Indiantown, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.