BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated June 26, 2025

Renovation of a water / sewer project in Independence, Missouri. Completed plans call for the renovation of a water / sewer project.

The City of Independence, Missouri invites bids from firms to perform the following scope of work at the Courtney Bend Water Plant for the Water Department. The Contract for this project shall provide for, but not limited to, all equipment, materials, workmanship, and labor required for the proper removal and reinstall of North and South walls of Filter Valve House #2. Please submit all questions regarding this Invitation to Bid online. Event Bid Description: Dial in by phone +1 660-631-8082,,515706369# United States, Marshall Find a local number Phone conference ID: 515 706 369#. Even pre bid Description: The Courtney Bend Water Plant is located North of the City of Independence, MO; adjacent to Missouri Highway 291 and the Missouri River. This meeting will be hosted by Zach Dean, Project Compliance Coordinator-Water Division. Scope of Work 1.1. The City of Independence, Missouri invites bids from firms to perform the following scope of work at the Courtney Bend Water Plant for the Water Department. The Contract for this project shall provide for, but not limited to, all equipment, materials, workmanship, and labor required for the proper removal and reinstall of North and South walls of Filter Valve House #2. The scope of work to be completed by the Contractor for this project shall be categorized for the purpose of bidding as follows: Line Item No. 1) Provide for all labor, equipment, materials, and services required and as specified for complete tear off and removal of the existing siding on the North and South of Filter Valve House no. 2, it's North door, and windows on the South of the FVH. Line Item No. 2) Provide for all labor, equipment, materials, and services required and as specified for the removal of the existing angle iron on the bottom transition. Line Item No. 3) Provide all labor, equipment, materials, and services required and as specified to install new siding and North door. Line Item No. 4) Provide all labor, equipment, materials, and services required and as specified to apply insulation on the inside of the structure. 1.5. Any delay or extra expense caused by encountering construction or materials other than anticipated or different from those indicated herein shall not constitute grounds for claims by the Contractor for additional payments or damages.

Bid Results

Water / Sewer

$64,725.00

Public - City

Renovation

3

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
45
Bidding Soon
1,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

14700 Cement City Rd, Independence, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.