BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a civil project in Provincetown, Massachusetts. Completed plans call for site work for a water / sewer project.

The Town of Provincetown, MA will receive sealed bids for construction of Jerome Smith Pump Station, Contract No. 16716 and CWSRF No. 16716. The scope of work includes constructing one Submersible Pumping Station and all appurtenances to provide wastewater service to the Jerome Smith sewer subarea of Provincetown, MA. The Work involves construction of submersible wastewater pumping station including connection to an existing 8-inch gravity sewer and 4-inch force main. The Work of the Project shall be substantially complete no later than December 1, 2025. Question Deadline 05/26/2025 at 12:00 PM ET Interpretations or clarifications to questions shall be submitted through the Provincetown procurement portal. Bidder understands that all bids for this project are subject to M.G.L. c.30, s39M as modified by the Town of Provincetown's Acts of 2000, Chapter 191. A copy of the Acts and a summary document of the specific modifications to c. 30, S39M is provided as Appendix B to the Contract Documents. 11. Minimum Wage Rates as determined by the Executive Office of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed work under this contract. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. Both Federal and State wage rates for this project are included as an Attachment to Section 00800 - Supplementary Conditions. 12. A weekly certified payroll submittal shall be required of the successful bidder in accordance with MGL C149, S27B. No payments will be made by the Town of Provincetown, MA until all payroll information necessary for the Town to determine compliance with prevailing wage law requirements for the time period of the payment request have been submitted. 13. Bidders are not to include in their Bid Proposal sales and compensating use taxes on materials and supplies purchased for this project. All materials used are tax exempt. 14. This Contract to be awarded as the result of this Advertisement for Bids is funded in part through the Massachusetts Department of Environmental Protection, Bureau of Resource Protection, by loans from the Massachusetts Clean Water Trust (the "Trust"). This Contract will be subject to the Department of Environmental Protection regulations contained in 310 CMR 44.00, "DEP Selection, Approval and Regulation of Water Pollution Abatement Projects Receiving Financial Assistance from the State Revolving Fund" in effect on the date of issuance of the assistance award (DEP Project Approval Certificate) by the Department. 15. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs. The two low bidders shall submit completed DBE forms (EEO-DEP-190C, EEO-DEP-191C and the DBE Certification of United States Citizenship form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non-responsive. No waiver of any provision of this section will be granted unless approved by the Department of Environmental Protection (MassDEP)." 16. The project does not require the Contractor to have a DCAMM Certification or MassDOT Highway Division Certification. 17. The Project requires compliance with the Massachusetts Diesel Retrofit Program (MDRP) by use of engine emission controls that are EPA certified, or their equivalent, on the off-road (non-registered) diesel vehicles/equipment used at the job site. Bidders must submit a signed and dated Statement of Intent to Comply as part of their Bid Proposal Document. Failure to comply with these MassDEP requirements may be deemed to render a proposal nonresponsive. No waiver of any provision of these MassDEP requirements will be granted unless approved by the MassDEP. 18. The Contractor shall not discriminate about the personnel employed on this project on the basis of race, color, creed, national origin, gender, sexual preference, handicap or age. 19. The Owner reserves the right to award the Project subject to appropriation. 20. The Town of Provincetown, MA reserves the right to accept and/or reject any and all bids and to waive any informalities to the extent allowed by law, and to make the award as deemed to be in the best interest of the Town.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

41

29

4

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
227
Bidding Soon
2,731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Winslow St, Provincetown, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.