BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and paving for a transportation facility in Faribault, Minnesota. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

he work generally consists of reconstructing and rehabilitating aircraft apron, taxiway, and taxilane pavement. Major work items and approximate quantities include: 1. 17,800 SY Cold Milling 2. 3,000 SY HMA Pavement Removal 3. 770 LF RCP Storm Sewer 4. 4 Type F Storm Structures 5. 1,000 CY Unclassified Excavation 6. 3,000 SY Aggregate Base 7. 2,500 Tons HMA Pavement 8. 18 Aircraft Tie Downs 9. Traffic Control 10. Pavement Markings FAA AIP No. 3-27-0030-017 Question Deadline 05/28/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail, email, or fax. Contact individual shall be as follows: Adam Wilhelm, P.E. Foth Infrastructure & Environment, LLC 8191 Birchwood Court, Suite L Johnston, IA 50131 515-254-2522 (Phone) 515-254-1642 (Fax) Adam.Wilhelm@Foth.com Questions received less than seven days prior to the date for opening of Bids may not be answered. The estimate of probable construction cost is a range of $950,000 to $1,050,000. Last Day for Questions –Tuesday, May 29 at 5:00 pm Award Date: 7/7/2025 Contract Start Date: 1/8/2025 Construction Start Date: 18/8/2025 Construction End Date: 31/10/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$732,729.00

Public - City

Paving, Site Work

25

9

11

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
126
Bidding Soon
1,402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

August 18, 2025

Project location map

3401 MN-21, Faribault, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.