Published June 6, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000293886 SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of: (a) Concrete Pavement Preservation (i) Meridian Drive - Inksbrook Drive to Haggart Avenue (ii) Logan Avenue - Rail Crossing at Weston Street to Blake Street (b) Diamond Grinding (i) Logan Avenue - Rail Crossing at Weston Street to Blake Street (c) Mill and Fill (i) Northbound Century Street -Ellice Avenue to 75m South of Saskatchewan Avenue (ii) Westbound Grant Avenue - Chalfont Road to 50m west of Haney Street D3.2 The major components of the Work are as follows: (a) Concrete Paving Preservation and Diamond Grinding (i) Renewal of existing concrete joints through partial and full depth repairs (ii) Renewal of existing sidewalks, curbs, splash strips and median slabs as required (iii) Adjustment of existing catch basins, manholes and appurtenances as required (iv) Diamond grinding (v) Joint sealing of all joints within diamond grinding areas regardless of preexisting condition of sealant (incidental to Diamond Grinding) (vi) Crack routing and sealing as required (vii) Joint sealing all full depth repairs (incidental to Partial Slab Patch Repairs) (viii) Boulevard restoration as required (b) Asphalt Mill and Fill (i) Asphalt pavement milling (average thickness 50mm) (ii) Renewal of existing concrete joints through full depth concrete repairsiii) Partial depth asphalt patching of existing concrete joints (iv) Placement of Pavement Repair Fabric (v) Renewal of existing sidewalk, curbs, splash strips and median slabs as required (vi) Placement of asphalt overlay (average thickness 60mm) (vii) Reflective crack maintenance (viii) Boulevard restoration as required Diamond Grinding on Logan Avenue to be completed between June 30, 2025 and August 29, 2025. The Bidder shall include in their Bid Submission bid security in the form of a digital bid bond, in the amount of at least ten percent (10%) of the Total Bid Price, and agreement to bond A performance bond of a company registered to conduct the business of a surety in Manitoba, in the amount of fifty percent (50%) of the Contract Price Labour and material payment bond of a company registered to conduct the business of a surety in Manitoba, in an amount equal to fifty percent (50%) of the Contract Price. The Award Authority may reject all or any part of any Bid, or waive technical requirements or minor informalities or irregularities, if the interests of the City so require. Docs can be obtained from https://www.merx.com/mbgov/solicitations/open-bids/2025-Streets-Maintenance-Preservation-Program/0000293886 Question Deadline 05/29/2025

Bid Results

Roads / Highways

$1,592,915.00

Public - City

Paving, Site Work

9

7

2

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
36
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

June 30, 2025

Project location map

Multiple Locations, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.