BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated September 25, 2025

Site work and new construction of a bridge / tunnel in Twin Falls, Idaho. Design plans call civil work for a bridge / tunnel.

As of June 2, 2025, per owner, the project is very preliminary. They are working on the environmental phase of the project. Engineering design team is identified and they are on schedule. Between now and July 2026 they await the Board decision to proceed. Environmental studies phase - NEPA Documents, is a 2-year process and taking place 2027/2028. There are no construction timelines or budgets associated with this at this time. Per Idaho Department of Transportation an exact location for the crossing hasn’t not yet been decided. Multiple potential sites will need to be studied to determine what’s best for both traffic and the environment. The next steps include holding public meetings, according to the department. They are hoping to have that scheduled for the end of June 2025. From the May 2024 board meeting identified a need for feasibility study. 3rd Snake River Bridge Crossing submittal to FHWA of notice of intent (NOI) for approval to begin the NEPA environmental impact statement document. ITD has been evaluating how best to take the next steps on project scope and resources for the Snake River Bridge Crossing project. Most recently, considering the USDOT’s expected NEPA environmental changes ongoing in D.C. during the first quarter of 2025, there is an opportunity to help expedite the federal process to complete environmental studies in large part due to regional consensus on the preferred alternative.

Design

Bridges / Tunnels

$9,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
63
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2029

Project location map

To Be Determined, Twin Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.