Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 11, 2025 at 8:00 PM
Updated July 12, 2025
Renovation of a fire / police facility in Cutler Bay, Florida. Completed plans call for the renovation of a fire / police facility.
SCOPE OF WORK: Bidding Contractors are to provide sealed bids for all labor, material, transportation, equipment and perform all operations for the following project description to achieve the completion of the project requirements to include permit cost in accordance with the structural plans by Ingelmo Associates PA, dated 3/12/2025. The work in general consists of new storefront, windows and doors are to be Miami-Dade County approved Impact Resistant with current NOA's. The scope is inclusive of removing the existing windows, doors, garage overhead doors with all the ancillary accessories accompanies, i.e., Kantech security card access control systems, door sensors, electric door strikes, door hardware & lock systems to be replaced with new (refer to plans and specs for details in door schedule). All repairs such as drywall, stucco, painting, caulking, shutter removal, window shades removal and reinstallation associated with new windows and doors replacement are to be included in the bid price. Existing exterior roll-up doors are also to be removed and replaced with County approved 2023 FBC system and meeting the wind load calculations, to include motor, new photo eye sensors, exhaust system contacts, and painting to match existing. The types of contracts available under the MCC Program are construction projects, facility repairs, neighborhood improvements, emergency repairs and maintenance work with a maximum value of $5.0M; ORD 09-101. All capital departments are participating. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. ESTIMATED COST: $2,100,000.00 ADD-ALTERNATE #1: Asphalt Parking The Contractor shall provide a price to the alternate replacement of the front and rear asphalt apron & striping as noted on the plans. ADD-ALTERNATE #2: Bunker Gear Room The Contractor shall provide an alternate price for the Bunker Gear Room as noted on the plans. ADD-ALTERNATE #3: Painting Fire Station The Contractor shall provide an alternate price for painting the entire fire station using Sherwin Williams or approve equal product. Color selected by MDFR. ADD-ALTERNATE #4: Apparatus Bay Floor Sealer The Contractor shall adhere to the add alternate pricing for the installation of EliteCrete Systems epoxy flooring and Back-Track 60S anti-slip additive, all in accordance with the SOW and specification section 09 67 00. Bidders shall provide a separate bid price for each add-alternate identified above and on the Price Breakdown sheet provided. The County reserves the right to award any or all add- alternates or reject any or all add-alternates.
Post-Bid
Fire / Police
$2,100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
July 21, 2025
10850 SW 211 St, Cutler Bay, FL
Related To This Project
Cutler Bay, FL
Bid Date: Oct 29 2025
Cutler Bay, FL
--
Cutler Bay, FL
Bid Date: Aug 29 2025
Cutler Bay, FL
Bid Date: Oct 10 2025
Cutler Bay, FL
Bid Date: Dec 02 2025
Cutler Bay, FL
Bid Date: Dec 10 2025
Cutler Bay, FL
Bid Date: Jan 28 2026
Caribbean Boulevard Roadway Improvements Final Gap Project (SW 87 Avenue to SW 184 Street) - 5983075
Cutler Bay, FL
Bid Date: Feb 11 2026
Cutler Bay, FL
Bid Date: Jul 29 2025
Cutler Bay, FL
Bid Date: May 29 2025
Cutler Bay, FL
Bid Date: May 19 2025
Cutler Bay, FL
Bid Date: Apr 23 2025
Cutler Bay, FL
Bid Date: Mar 26 2025
Cutler Bay, FL
Bid Date: Dec 26 2024
Cutler Bay, FL
Bid Date: Feb 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
