Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work and paving for a mixed-use development in La Conner, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Contracting Agency is the Swinomish Tribal Community (SITC) and its officers and employees, particularly the Planning and Community Development Department and the Construction Division who are responsible for the administration of the contract. Davis Bacon related Acts and Amendments do not apply, these are general fund hard dollars. Concepts and documents can be viewed on Public Works-Swinomish Indian Tribal Community. Contractors submitting bids pursuant to this RFP shall be required to commit to the execution of a contract for the work prior to the preconstruction meeting and/ or within Thirty (30) days of award notification. Baring normal work stoppages such as weather delays and Holidays. Contractors submitting bids pursuant to this RFP shall be required to commit to the completion of the work on or before the date stated in the "Notice to Proceed". All deliverables and time schedules to be negotiated and agreed upon by all parties OR with all subcontracting companies and SITC prior to issuance of NTP. However, all work Shall be completed substantially by the end of 30 days of work. Every calendar day past 30 days (Possibly negotiated, must meet functionality deadline) that work is not complete the contractor shall pay a 400.00 per day Penalty to SITC excluding weather-related circumstances. Phase 1 of the Air Quality Station will only include the civil work as per the plan set from HLN Engineering. This includes the installation of the the non-red-highlighted gravel road, concrete pad prep for future building, and erosion control. Steel plates are required to cover the road entrance in order to preserve the existing colvert. The gravel road will start at the edge of the right of way line. Approx. 18' from roadway As seen in Attachment F. Fill shall be used and compacted as required by State-wide Urban Design and Specifications (SUDAS), or when so directed by the Project Manager. Each contractor submitting a bid pursuant to this proposal shall be required to commit to and provide to SITC, at the time of the award and execution of the contract, a certificate or certificates of insurance, documenting coverages and in amounts as required by SITC that is attached to this RFP. Retainage of 5% will be withheld until completion of the project. Question Deadline - 06/12/2025 at 4:00 PM - Any questions for the project can be directed to the following person identified above and must be received. Site Walkthrough Description - Contractors are further advised that a Non-Mandatory Onsite Pre-Bid walkthrough will be held at 17606 Snee-Oosh Road, La Conner, WA. 98257. Swinomish Indian Tribal Community reserves the right to cancel this Request for Proposal at any time or any reason prior to award notification.
Award
Roads / Highways
$18,197.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2025
July 21, 2025
17606 Snee Oosh Rd, La Conner, WA
Related To This Project
La Conner, WA
--
La Conner, WA
Bid Date: Sep 18 2025
La Conner, WA
Bid Date: Nov 20 2025
La Conner, WA
Bid Date: May 22 2025
La Conner, WA
Bid Date: May 22 2025
La Conner, WA
Bid Date: Apr 24 2025
La Conner, WA
Bid Date: Feb 18 2025
La Conner, WA
Bid Date: Jan 27 2025
La Conner, WA
Bid Date: Jan 07 2025
La Conner, WA
--
La Conner, WA
Bid Date: Dec 19 2024
La Conner, WA
Bid Date: Dec 05 2024
La Conner, WA
Bid Date: Oct 24 2024
La Conner, WA
Bid Date: Sep 05 2024
La Conner, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
