Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated June 19, 2025
This is a service / maintenance or supply contract in Prescott, Arizona. Contact the soliciting agency for additional information.
Yavapai County (County) desires to conduct a traffic study and preliminary engineering design on Williamson Valley Road from Pioneer Parkway to Outer Loop Road. This study will address what improvements are needed that can be programmed to improve the safety, capacity, access, and mobility of the Williamson Valley corridor. As part of these improvements, the County would like to incorporate a 30% preliminary engineering design into this corridor assessment, based on the recommended solutions, to provide baseline and projected costs for the corridor improvements to allow for programming and planning. Questions Due by Monday, June 9, 2025 All questions will be submitted by email to Chris.Steele@yavapaiaz.gov. Recommended Contract Award Wednesday, September 3, 2025 The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
Public - County
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
Williamson Valley Rd, Prescott, AZ
Related To This Project
Prescott, AZ
Bid Date: Jul 24 2025
Prescott, AZ
--
Prescott, AZ
Bid Date: Jul 31 2025
Prescott, AZ
Bid Date: Aug 14 2025
Prescott, AZ
Bid Date: Aug 14 2025
Prescott, AZ
Bid Date: Aug 21 2025
Prescott, AZ
Bid Date: Jun 12 2025
Prescott, AZ
Bid Date: Jun 12 2025
Prescott, AZ
Bid Date: May 23 2025
Prescott, AZ
Bid Date: May 08 2025
Prescott, AZ
Bid Date: May 01 2025
Prescott, AZ
Bid Date: Apr 24 2025
Prescott, AZ
Bid Date: Apr 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
