Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Site work and paving for a mixed-use development in Greenwood, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Lander University is seeking a qualified, licensed, and insured contractor to perform the demolition and construction as specified herein. The project consists of three geographically related asphalt demolition, stormwater inlet box relocation and the construction of a new vehicular entrance / exit onto Durst Avenue from the Lander University Parking Lot # 2. Start date: 06/19/2025 qEnd date: 08/08/2025 Laura Lander Hall Vehicular Access Demolition a. Laura lander Hall has a "horseshoe" shaped vehicle access road. b. Demo and dispose of the existing perimeter concrete curb and asphalt c. Demo and dispose of the existing inner island concrete curb and asphalt d. Demo of existing subbase to a depth of at least 6 inches e. Procure, install, and ensure grade of topsoil to establish an elevation of surrounding lawn f. Procure and install Bermuda sod on all disturbed areas g. Construct approx. 117 linear ft. of 6-inch header curb along Willson Street. Install Stormwater Inlet Box on Lander Street a. Demo and disposal of existing storm water inlet b. Remove sufficient length of existing effluent pipe and cap / plug/ seal. c. Procure and install a new stormwater inlet box d. Make the necessary 12-inch HDPE piping connections and connect the new inlet box to the existing stormwater junction box as shown on project drawing C-400. Ensure proper grade and all piping joints / connections are sealed/ do not leak. e. Remove and re-install the granite curbing as necessary. f. Any asphalt disturbance will be repaired. Durst Avenue Vehicular Entrance / Exit a. Perform all necessary demolition and disposal of asphalt, subbase, concrete curb, etc...., as indicated on project drawing C-201. Topsoil to be stored onsite. b. Install 2 - 4-inch PVC conduit sleeves as indicated on project drawing C-400. c. Construct new concrete curb, asphalt, per project details on project drawing C-900. Ensure compliance will all SC DOT requirements and, to include the installation of the white and yellow thermoplastic. d. The civil design engineer, Heaner Design Group, is in the process of submitting the appropriate permitting applications.
Award
Sidewalks / Parking Lot
$73,474.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2025
June 19, 2025
403 Durst Ave W, Greenwood, SC
Related To This Project
Greenwood, SC
Bid Date: Jun 26 2025
Greenwood, SC
Bid Date: Jun 12 2025
Greenwood, SC
Bid Date: Jun 26 2025
Greenwood, SC
Bid Date: Jun 05 2025
Greenwood, SC
Bid Date: Jun 19 2025
Greenwood, SC
Bid Date: Jul 07 2025
Greenwood, SC
--
Greenwood, SC
Bid Date: Jul 09 2025
Greenwood, SC
Bid Date: Jun 09 2025
Greenwood, SC
Bid Date: Jun 05 2025
Greenwood, SC
Bid Date: Jun 09 2025
Greenwood, SC
Bid Date: May 15 2025
Greenwood, SC
Bid Date: May 12 2025
Greenwood, SC
Bid Date: May 08 2025
Greenwood, SC
Bid Date: May 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
