BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Site work and paving for a mixed-use development in Greenwood, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Lander University is seeking a qualified, licensed, and insured contractor to perform the demolition and construction as specified herein. The project consists of three geographically related asphalt demolition, stormwater inlet box relocation and the construction of a new vehicular entrance / exit onto Durst Avenue from the Lander University Parking Lot # 2. Start date: 06/19/2025 qEnd date: 08/08/2025 Laura Lander Hall Vehicular Access Demolition a. Laura lander Hall has a "horseshoe" shaped vehicle access road. b. Demo and dispose of the existing perimeter concrete curb and asphalt c. Demo and dispose of the existing inner island concrete curb and asphalt d. Demo of existing subbase to a depth of at least 6 inches e. Procure, install, and ensure grade of topsoil to establish an elevation of surrounding lawn f. Procure and install Bermuda sod on all disturbed areas g. Construct approx. 117 linear ft. of 6-inch header curb along Willson Street. Install Stormwater Inlet Box on Lander Street a. Demo and disposal of existing storm water inlet b. Remove sufficient length of existing effluent pipe and cap / plug/ seal. c. Procure and install a new stormwater inlet box d. Make the necessary 12-inch HDPE piping connections and connect the new inlet box to the existing stormwater junction box as shown on project drawing C-400. Ensure proper grade and all piping joints / connections are sealed/ do not leak. e. Remove and re-install the granite curbing as necessary. f. Any asphalt disturbance will be repaired. Durst Avenue Vehicular Entrance / Exit a. Perform all necessary demolition and disposal of asphalt, subbase, concrete curb, etc...., as indicated on project drawing C-201. Topsoil to be stored onsite. b. Install 2 - 4-inch PVC conduit sleeves as indicated on project drawing C-400. c. Construct new concrete curb, asphalt, per project details on project drawing C-900. Ensure compliance will all SC DOT requirements and, to include the installation of the white and yellow thermoplastic. d. The civil design engineer, Heaner Design Group, is in the process of submitting the appropriate permitting applications.

Award

Sidewalks / Parking Lot

$73,474.00

Public - State/Provincial

Paving, Site Work

7

3

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
91
Bidding Soon
1,010
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

June 19, 2025

Project location map

403 Durst Ave W, Greenwood, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.