BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Renovation of a residential development in Niles, Michigan. Completed plans call for the renovation of a residential development.

The estimated project cost is 15k. All bidders are required to sign a certification that they will comply with all Federal and State non- discrimination laws and regulations. This is a project funded in part through the US Department of Housing and Urban Development, CDBG Program and in part by area foundations. The City reserves the right to reject any or all proposals, to waive irregularities in proposals and to accept the proposal that in the opinion of the City Council is most advantageous to the City. No bid shall be withdrawn after the opening of bids for a period of thirty (30) days after the scheduled time of receiving bids. ADDRESS: 603 S 16th HVAC: The City of Niles is looking for an HVAC provider to remove the old system and install a new HVAC system that meets the following criteria as well as all local and State codes: 1. Clearance The furnace should have at least 3 feet of clearance on all sides, with an additional 2 feet in the front for maintenance. 2. Location The furnace should be installed in an area with adequate ventilation to prevent exhaust gases from building up. It should also be close to an electrical outlet and gas line. 3. Combustion air The furnace needs to be able to take in enough combustion air. This can come from indoor or outdoor sources, and the size of the air supply opening depends on the furnace and ductwork. 4. Ductwork The ducts should be properly sized and positioned to provide enough fresh air. They should also be inspected for leaks, which can harm the furnace's efficiency. 5. Furnace size The furnace's size should be appropriate for the square footage of your home. 6. Annual Fuel Utilization Efficiency (AFUE) The furnace should have an AFUE rating of at least 80%. 7. Circuit breaker Larger furnaces may require more than one circuit breaker. 8. Manufacturer's instructions & Warranty 9. The furnace manufacturer's instructions will be referenced prior to beginning installation and the warranty transferred to the homeowner upon installation. complete the entire work of this contract by July 30, 2025. The Contractor will be charged $100.00 per day for each calendar day

Award

Residential Subdivision

$19,700.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
153
Bidding Soon
1,847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

603 S 16th St, Niles, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.