Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated July 23, 2025
Site work, new construction and renovation of a mixed-use development in Thornton, Colorado. Working plans call for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
“The owner has selected a Construction Manager. A timeline for construction has not yet been established.” **As of July 22,2025, the project was awarded to Swinerton Energy, Inc. but the awarded amount is not available.** Reference Number 0000388470 Job Location: United States, Colorado, Adams County Question Deadline 06/11/2025 at 10:00 AM MT Malley Drive Elementary School (MDE), Stem Lab K-8 School (STLAU/STL), Legacy High School (LEH), and Mountain Range High School (MRH) will undergo targeted infrastructure improvements and renovations as described in the Detailed Bond Report. Specific work will consist of both general renovation and new construction. General renovation work will include HVAC system updates, water distribution, site lighting, paving, plumbing, fire alarm, doors, flooring, and network cabling. New construction will include standalone toilet facilities. Malley Drive Elementary (MDE): Scope includes but is not limited to, HVAC replacement including control system, cabinetry, doors, fire alarm system, floor finishes, painting, exterior wall repair, landscaping, irrigation, paving, new playground equipment, plumbing fixtures, site lighting, water distribution. Network cabling includes testing and certification (432 data cables, 0 fiber cables). Minor asbestos abatement work will be performed at this school with owner provided contractor. Stem Lab K-8 School (STLAU/STL): Scope includes but is not limited to; floor finishes, gymnasium bleacher removal and replacement, HVAC additions and replacement, lighting control systems, and water distribution systems. Legacy High School (LEH): Scope includes but is not limited to; a new toilet building located in the athletic fields area. In addition to the building, minor site work, and utilities to the building are included. Mountain Range High School (MRH): Scope includes but is not limited to; a new toilet building located in the athletic fields area. In addition to the building, minor site work, and utilities to the building are included. Projected Construction Budget = $8,994,612 for all 4 sites 1. Malley Drive Elementary School - DAG required Projected Construction Budget = $3,241,892 (Does NOT include Network Cabling) Project Network Cables = 432 New Data Cables, 0 New MDFIDF Fiber Runs, and 5-10 New Voice/Analog Cables, include testing and certification (Budgetary number to be determined through design). 2. Stem Lab K-8 School - DAG required Projected Construction Budget = $1,300,220 3. Legacy High School - DAG required Projected Construction Budget = $2,226,250 4. Mountain Range High School - DAG required Projected Construction Budget = $2,226,250
Pre-Construction/Negotiated
Educational
$8,994,612.00
Public - County
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
May 29, 2026
Multiple Locations, Thornton, CO
Related To This Project
Thornton, CO
Bid Date: Jun 25 2025
Thornton, CO
--
Thornton, CO
Bid Date: Jul 03 2025
Thornton, CO
--
Thornton, CO
Bid Date: Aug 15 2025
Thornton, CO
--
Thornton, CO
--
Thornton, CO
--
Thornton, CO
Bid Date: Jun 25 2025
Thornton, CO
Bid Date: Jun 09 2025
Thornton, CO
Bid Date: May 20 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
